Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Prepare to modify/redesign electronics and communications system
  2. WHS/OHS risk control measures and workplace procedures in preparation for work activity are followed
  3. Safety hazards that have not previously been identified are noted on job safety assessment, assessed and risk control measures implemented
  4. Appropriate person/s is consulted to ensure the work is coordinated effectively with others involved on the worksite
  5. System operating parameters are identified by reviewing system specifications and component technical data
  6. Limitations, use and operation of the electronics and communication system to be modified are determined from original specifications, manufacturer data and industry standards
  7. Extent of modification is determined from measurements, tests, inspections, system limitations and other relevant requirements
  8. Specifications and instructions for the modifications are documented in accordance with job requirements and workplace procedures
  9. Tools, equipment, applications and devices needed for the electronics work are obtained in accordance with workplace procedures and checked for correct operation and safety
  10. Preparatory work is checked to ensure no unnecessary damage has occurred and complies with job requirements and specifications
  11. Generate modification and redesign of electronics and communications system
  12. Alternative modification is considered and discussed with appropriate person/s
  13. Safety, functionality and economic considerations are incorporated in the proposed modification design
  14. Proposed communications system modification complies with job requirements and specifications for system design alteration are documented
  15. Changes in the use and operation of the communications system as a consequence of the proposed modification are included in the design documentation
  16. Unplanned situations are responded to in accordance with workplace procedures, discussions with appropriate person/s and job specifications or requirements in a manner that minimises risk to personnel and equipment
  17. Modification and redesign are carried out efficiently without unnecessary waste of materials or damage to electronics apparatus, the surrounding environment or services using sustainable energy principles
  18. Complete design and report modification activities
  19. Proposed modification is checked in accordance with workplace procedures for compliance with relevant job requirements and industry standards
  20. Worksite is cleaned and made safe in accordance with workplace procedures
  21. Proposed modification is submitted for appropriate organisational approval and, as required, statutory or regulatory approval
  22. Approved copies of the communications system modification and redesign documents are issued and copies retained, documented and stored in records in accordance with workplace procedures

Performance Evidence

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements, performance criteria and range of conditions on at least one occasion and include:

developing outlines of alternative redesigns

developing the modified/redesigned system within the safety and functional requirements and budget limitations

documenting and presenting modifications/redesigns effectively

successfully negotiating system alteration requests

obtaining approval for final modified/redesigned system

dealing with unplanned events

applying relevant work health and safety (WHS)/occupational health and safety (OHS) requirements, workplace procedures and practices, including using of risk control measures

applying sustainable energy principles and practices.


Knowledge Evidence

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements, performance criteria and range of conditions and include knowledge of:

electronic and communications engineering design processes

functional and non-functional requirements of a customer encompassing:

scope of the project

non-functional requirements, including:

economics (time and cost), including total life cycle costs

design

implementation (construction)

maintenance (operation)

decommissioning (recycling)

aesthetics (quality)

design objectives (specifications)

specifications by defining the problem and producing a solution to satisfy the customer

creation of the design plan through solution synthesis by selecting or creating the solution

analysis

optimisation of the proposed solution

validations of the resulting design against the customer's needs

implementation of the selected design

project to be carried out in accordance with current WHS/OHS procedures

relevant job safety assessments or risk mitigation processes

relevant manufacturer specifications

relevant workplace policies and procedures.