Elements and Performance Criteria
- Prepare to install interval meter
- Health and safety hazards are identified, risks assessed and risk control measures and workplace procedures implemented in preparation for the work
- Safety hazards not previously identified are noted on job safety assessments and existing risk control measures implemented
- Switchboard on which the meter is to be installed is inspected and evaluated for compliance with safety, functionality and industry standards
- Approval to rectify safety and/or functionality defects of the switchboard is sought from relevant person/s in accordance with workplace procedures
- Electrical meter installation and/or rectification work is prepared in consultation with relevant person/s effected by the work and sequenced appropriately
- Materials needed for meter work are obtained in accordance with workplace procedures and checked against job requirements and specifications
- Tools, equipment and testing devices needed for meter work are obtained in accordance with workplace procedures and checked for correct operation and safety
- Install interval meter
- Need to test or measure live work is determined in accordance with WHS/OHS requirements and conducted within workplace safety procedures
- Existing meter is checked and isolated in accordance with WHS/OHS requirements and workplace procedures
- Approved rectification work is carried out to comply with industry standards and in accordance with workplace procedures
- Meter is installed to comply with relevant technical industry standards, job specifications and requirements
- Meter power and communication connections are made in accordance with manufacturer specifications, functional and regulatory requirements
- Meter operating parameters are set in accordance with manufacturer specifications, functional and regulatory requirements
- Unplanned situations are responded to in accordance with workplace procedures in a manner that minimises risk to personnel and equipment and with the approval of an authorised person/s
- Ongoing checks of the quality of installed apparatus are undertaken in accordance with workplace procedures
- Meter installation is carried out efficiently without unnecessary waste of materials or damage to apparatus circuits, the surrounding environment or services using sustainable energy principles
- Complete and report meter installation activity
- Worksite is cleaned and made safe in accordance with workplace procedures
- Final inspection and tests are made to ensure the installed meter conforms to job requirements
- 'As-installed' meter or rectification work is documented and appropriate person/s notified in accordance with workplace procedures