Elements and Performance Criteria
- Prepare to conduct electrical inspections and tests on induction machines
- Existing WHS/OHS risk control measures for work preparation are followed
- Scope of work is determined from job specifications and regulatory requirements
- Advice is sought from the work supervisor to ensure the work is coordinated effectively with others
- Winding data is obtained from winding data records or directly from measurements of stator and recorded in accordance with workplace procedures
- Materials required for the work are obtained in accordance with workplace procedures
- Tools, equipment and testing devices needed to carry out work are obtained and checked for correct operation and safety
- Conduct electrical inspections and tests on induction machines
- Machines/equipment are inspected, checked and isolated in accordance with WHS/OHS requirements and workplace procedures
- Electrical inspection and tests are conducted to establish operational condition of the machine in accordance with workplace procedures and instructions
- Serviceability status of the machine is determined from inspection and test results and recorded
- Unplanned situations are responded to in accordance with workplace procedures in a manner that minimises risk to personnel and equipment
- Electrical testing is completed within timeframe, environment and workplace conditions
- Complete workplace reports
- Serviceability status of the machine is documented in accordance with workplace procedures and appropriate person/s notified