Elements and Performance Criteria
- Prepare to conduct mechanical tests on electrical machines and components
- Existing WHS/OHS risk control measures for work preparation are followed
- Scope of work is determined from job sheets, specifications and regulatory requirements
- Advice is sought from the work supervisor to ensure the work is coordinated effectively with others
- Machine data is obtained from data records or directly from measurements and recorded in accordance with workplace procedures
- Materials required for the work are obtained in accordance with workplace procedures
- Tools, equipment and testing devices needed to carry out work are obtained and checked for correct operation and safety
- Conduct mechanical tests on electrical machines and components
- Machines/equipment are checked and isolated in accordance with WHS/OHS requirements and workplace procedures
- Mechanical tests/measurements are conducted to establish operational condition of the machine
- Serviceability status of the machine is determined from test results and recorded
- Unplanned situations are responded to in accordance with workplace procedures in a manner that minimises risk to personnel and equipment
- Electrical coil work is completed within timeframe, environment and workplace conditions
- Complete workplace report
- Serviceability status of the machine, including specifications for any repair work required, is documented in accordance with workplace procedures and appropriate person/s notified