Elements and Performance Criteria
- Prepare to install and maintain emergency safety systems
- Hazards are identified, health and safety risks assessed and existing risk control measures and workplace procedures implemented
- Installation and/or maintenance is prepared in consultation with others affected by the work and sequenced appropriately
- Nature and location of work is determined from workplace documentation or appropriate person/s to determine the scope of work
- Location of apparatus and associated equipment is planned within the constraints of the building structure, significants and regulations
- Advice is sought from appropriate person/s to ensure work is coordinated effectively with others
- Material for the installation work is obtained in accordance with workplace procedures and checked against job requirements
- Tools, equipment and testing devices needed for installation work are obtained in accordance with workplace procedures and checked for correct operation and safety
- Preparatory work is checked to ensure no damage has occurred and complies with job specifications
- Install and maintain emergency safety systems
- Need to test or measure live electrical work is determined in accordance with WHS/OHS requirements and workplace procedures
- Circuits/machines/plant are checked and isolated, as required, in accordance with WHS/OHS requirements and workplace procedures
- Apparatus and associated equipment are installed or maintained to comply with relevant industry technical standards, job specifications and requirements with sufficient access to enable terminations for adjustment and maintenance
- Wiring is terminated at apparatus and associated equipment in accordance with manufacturer specifications and functional and regulatory requirements
- Methods for dealing with unplanned situations are discussed with appropriate person/s, documented and acted upon in a manner that minimises risk to personnel and equipment
- Ongoing checks of the quality of installed apparatus are undertaken in accordance with workplace procedures
- Apparatus installation is carried out efficiently without unnecessary waste of materials or damage to apparatus, circuits, the surrounding environment or services using sustainable energy principles
- Complete and report on installation or maintenance activities
- Worksite is cleaned and made safe in accordance with workplace procedures
- Final inspections and tests are made to ensure the installed or maintained apparatus conforms to job requirements
- 'As-installed' emergency safety systems apparatus and associated equipment are documented and appropriate person/s notified in accordance with workplace procedures