Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Prepare to install and maintain emergency safety systems
  2. Hazards are identified, health and safety risks assessed and existing risk control measures and workplace procedures implemented
  3. Installation and/or maintenance is prepared in consultation with others affected by the work and sequenced appropriately
  4. Nature and location of work is determined from workplace documentation or appropriate person/s to determine the scope of work
  5. Location of apparatus and associated equipment is planned within the constraints of the building structure, significants and regulations
  6. Advice is sought from appropriate person/s to ensure work is coordinated effectively with others
  7. Material for the installation work is obtained in accordance with workplace procedures and checked against job requirements
  8. Tools, equipment and testing devices needed for installation work are obtained in accordance with workplace procedures and checked for correct operation and safety
  9. Preparatory work is checked to ensure no damage has occurred and complies with job specifications
  10. Install and maintain emergency safety systems
  11. Need to test or measure live electrical work is determined in accordance with WHS/OHS requirements and workplace procedures
  12. Circuits/machines/plant are checked and isolated, as required, in accordance with WHS/OHS requirements and workplace procedures
  13. Apparatus and associated equipment are installed or maintained to comply with relevant industry technical standards, job specifications and requirements with sufficient access to enable terminations for adjustment and maintenance
  14. Wiring is terminated at apparatus and associated equipment in accordance with manufacturer specifications and functional and regulatory requirements
  15. Methods for dealing with unplanned situations are discussed with appropriate person/s, documented and acted upon in a manner that minimises risk to personnel and equipment
  16. Ongoing checks of the quality of installed apparatus are undertaken in accordance with workplace procedures
  17. Apparatus installation is carried out efficiently without unnecessary waste of materials or damage to apparatus, circuits, the surrounding environment or services using sustainable energy principles
  18. Complete and report on installation or maintenance activities
  19. Worksite is cleaned and made safe in accordance with workplace procedures
  20. Final inspections and tests are made to ensure the installed or maintained apparatus conforms to job requirements
  21. 'As-installed' emergency safety systems apparatus and associated equipment are documented and appropriate person/s notified in accordance with workplace procedures

Performance Evidence

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements, performance criteria and range of conditions on at least two separate occasions and include:

applying relevant work health and safety (WHS)/occupational health and safety (OHS) workplace procedures and practices, including using of risk control measures

applying sustainable energy principles and practices

completing and reporting installation and maintenance activities

installing electrical emergency safety systems

maintaining electrical emergency safety systems, including:

determining the operating parameters of existing electrical safety systems

using established problem-solving methods

interpreting measured values appropriately

providing effective solutions to electrical safety system problems

dealing with unplanned events in accordance with workplace procedures in a manner that minimises risk to personnel and equipment

preparing to install emergency safety systems

preparing to maintain emergency safety systems.


Knowledge Evidence

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements, performance criteria and range of conditions and include knowledge of:

installing and maintaining electrical emergency safety systems, including:

cells and batteries in common use:

primary cells

secondary cells

discharging

recharging

terminal voltages

capacity

discharge and recharge characteristics

battery configurations and applications

cell and battery safety practices

electrical installations and emergency systems, including:

principles and practices of electrical emergency safety systems for electrical installations as contained in relevant Australian Standards, Building Code of Australian (BCA) and associated hazards documentation

arrangement and requirements for fire and smoke control equipment

arrangement and requirements for emergency warning and intercommunications systems

arrangement and requirement for emergency power supplies

relevant job safety assessments or risk mitigation processes

relevant manufacturer specifications

relevant WHS/OHS legislated requirements

relevant workplace documentation

relevant workplace policies and procedures

sustainable energy principles and practices.