Elements and Performance Criteria
- Prepare to install and replace LV CT metering
- WHS/OHS hazards are identified, risks are assessed, and control measures are implemented for work preparation
- WHS/OHS hazards not previously identified are noted, risks assessed and risk control measures implemented
- Switchboard on which the meter/s and CTs are to be installed, inspected and tested are evaluated for compliance with safety and relevant industry standards
- Further work instructions for safety and/or functionality defects of the switchboard are sought from appropriate person/s in accordance with workplace procedures
- Installation of the meter, sequence and rectification work is prepared in consultation with relevant person/s
- Material needed for the work is obtained in accordance with workplace procedures and checked against work requirements
- Tools, equipment and testing devices needed for work are obtained in accordance with workplace procedures and checked for correct operation and safety
- Install and replace CT metering
- Need to test and measure live electrical work is determined in accordance with WHS/OHS requirements and workplace procedures
- Existing metering is checked and isolated in accordance with WHS/OHS requirements and workplace procedures
- Approved rectification work is carried out to comply with relevant industry standards and workplace procedures
- Meters and CTs are installed and replaced to comply with relevant industry standards and work specifications
- Metering power, functional requirements and communication connections, as required, are in accordance with manufacturer specifications and relevant industry standards
- Meter operating parameters and functional requirements are in accordance with manufacturer specifications and relevant industry standards
- Unplanned situations are responded to in accordance with workplace procedures and with the approval of an authorised person in a manner that minimises risk to personnel and equipment
- Quality checks of the installed apparatus are undertaken in accordance with workplace procedures
- Metering and CT installation is carried out efficiently without unnecessary waste of materials, services, damage to apparatus, circuits or environment using sustainable energy principles
- Complete and report metering installation activities
- Worksite is cleaned and made safe in accordance with workplace procedures
- Quality checks of the installed metering and CTs is in accordance with relevant industry standards
- Metering and CT work is documented and appropriate person/s notified in accordance with workplace procedures