Elements and Performance Criteria
- Prepare to assist in commissioning process control systems
- WHS/OHS risk control measures and workplace procedures are followed in preparation for work
- Safety hazards that have not previously been identified are noted and risk control measures implemented
- Commissioning plan is reviewed with relevant team members to ensure commissioning role/s of members are identified and ensure work is coordinated effectively in accordance with workplace procedures
- Measurement parameters are identified with team in accordance with workplace procedures, process requirements and manufacturer instructions
- Tools, equipment and testing devices required for work are obtained in accordance with workplace procedures and checked for correct operation and safety
- Preparatory work is checked to ensure no damage has occurred and work is in accordance with relevant industry standards
- Need to test and measure live work is determined in accordance with WHS/OHS requirements and workplace procedures
- Circuits are checked and isolated in accordance with WHS/OHS requirements and workplace procedures
- Assist in commissioning process control systems
- Commissioning testing/measuring devices are connected and set up in accordance with relevant industry standards for control system and work instructions
- Process instruments and apparatus are set up and adjusted in accordance with relevant industry standards, process control requirements, equipment manufacturer instructions and work instructions
- Adjustments are made to provide optimum transmission/reception performance in accordance with relevant industry standards
- Decisions for dealing with unplanned situations are made from discussions with relevant person/s and/or job specifications
- Methods for dealing with unplanned situations are selected in accordance with WHS/OHS requirements and job specifications
- Commissioning assistance is carried out efficiently without waste of materials or damage to apparatus, the surrounding environment or services using sustainable energy principles
- Complete and report commissioning activities
- Worksite is cleaned and made safe in accordance with workplace procedures
- Adjustment settings are documented and relevant person/s notified in accordance with workplace procedures