Elements and Performance Criteria
- Identify cabling and tubing
- Hazards are identified, risks are assessed and control measures implemented
- Safety hazards not previously identified are reported on job safety assessment and advice on risk control measures are implemented
- Installation of cabling and tubing is prepared in consultation with relevant person/s and scheduled in accordance with workplace procedures
- Nature and location of work is determined from documentation and/or relevant person/s to determine scope of work
- Cable and tube routes are planned within constraints of building, plant structure, significants and regulations
- Advice is sought from appropriate person/s to ensure work is coordinated effectively with others
- Material needed for installation work is obtained in accordance with workplace procedures and checked against job requirements
- Tools, equipment and testing devices needed for work are obtained in accordance with workplace procedures and checked for correct operation and safety
- Work is checked by supervisor to ensure and work complies with job requirements
- Install cabling, tubing and accessories
- Plant/machines/equipment are checked and isolated in accordance with workplace procedures
- Cabling, tubing and accessories are installed to comply with technical standards, job specifications and work requirements with sufficient excess to affect terminations
- Accessories are installed in required locations within acceptable tolerances
- Cables and conductors are terminated at accessories in accordance with manufacturer specifications and regulatory requirements
- Tubing is terminated at accessories in accordance with manufacturer specifications and regulatory requirements
- Methods for dealing with unplanned situations are discussed with relevant person/s and documented
- Unplanned situations are responded to in accordance with workplace procedures and approval of authorised person/s
- Ongoing quality checks of installed wiring is undertaken in accordance with workplace procedures
- Cabling and tubing installations are performed using sustainable energy principles without wasting materials and energy, damaging apparatus or surrounding environment in accordance with workplace procedures
- Complete and report installation activities
- Worksite is cleaned and made safe in accordance with workplace procedures
- Final checks are made to ensure installed wiring conforms to requirements
- 'As-installed' cables, tubes and accessories are documented and relevant person/s notified in accordance with workplace procedures