Elements and Performance Criteria
- Prepare to work on density/level measurement components and system
- Hazards are identified, risks assessed and control measures implemented
- Nature of the density/level measurement problem is identified from documentation or appropriate person/s to determine the scope of work to be undertaken
- Appropriate person/s is consulted to ensure work is coordinated effectively with others
- Materials required for the work are determined in accordance with workplace procedures
- Tools, equipment and testing devices needed to carry out the work are obtained and checked for correct operation and safety in accordance with workplace procedures
- Solve density/level measurement problems
- Need to inspect, test or measure electrical components of live electrical work is determined in accordance with job requirements and workplace safety procedures
- Density/level measurement apparatus is checked and isolated in accordance with WHS/OHS requirements and workplace procedures
- Relevant methods are used to solve measurement problems from tests and calculated values as they apply to density/level measurement systems
- Unplanned situations are responded to in accordance with workplace procedures and with the approval of an authorised person/s
- Problems are resolved using sustainable energy principles and without damage to apparatus, the surrounding environment or services in accordance with workplace procedures
- Complete work and document work activities
- Worksite is cleaned and made safe in accordance with workplace procedures
- Justification for solutions used to resolve density/level measurement problems is documented
- Work completion is documented and appropriate person/s notified in accordance with workplace procedures