Elements and Performance Criteria
- Prepare to conduct testing and inspection.
- OHS procedures for a given work area are identified, obtained and understood
- OHS risk control measures for work preparation are followed
- Documented apparatus functions and quality requirements are identified, obtained and understood
- Testing processes and procedures are reviewed and testing equipment is checked for correct operation and safety
- Apparatus testing and inspection is coordinated with others involved in the work to ensure work schedules are met and safety measures are followed
- Conduct apparatus tests.
- OHS risk control work measures and procedures are followed
- The need to test or measure live is determined in strict accordance with OHS requirements and when necessary conducted within established safety procedures
- Apparatus is checked as being isolated where necessary in strict accordance OHS requirements and procedures
- Testing is conducted in accordance with principles and technology of electrical measurement
- Test results are interpreted within the scope of required functionality and quality
- Conduct apparatus inspection.
- OHS risk control work measures and procedures are followed
- Apparatus is checked as being isolated where necessary in strict accordance OHS requirements and procedures
- Apparatus is inspected for compliance with quality/industry standards
- Work is completed in acceptable timeframe and given environment and workplace conditions
- Report on apparatus testing and inspection.