Elements and Performance Criteria
- Prepare to make up and assemble bus bars.
- OHS procedures for a given work area are identified, obtained and understood
- Established OHS risk control measures for work preparation are followed
- Work instructions including layout and wiring diagrams are obtained and understood
- Advice is sought from the work supervisor to ensure the work is co-ordinated effectively with others
- Materials required for the work are obtained in accordance with established routines and procedures
- Tools, equipment and testing devices needed to carry out the work are obtained and checked for correct operation and safety
- Make up and assemble bus bars.
- Established OHS risk control work measures are followed
- Circuits are checked as being isolated where necessary in strict accordance OHS requirements and procedures
- Bus bars are formed/made up in accordance with work instructions, standards and established routines
- Bus bars are connected in accordance with work instructions, standards and established routines
- Routine quality checks are carried out in accordance with work instructions
- Completed bus bar assembly is tested against work instructions and industry standards and in strict accordance with OHS risk control measures
- Procedures for referring non-routine events to immediate supervisor for directions are followed
- Work is carried out efficiently without waste of materials or damage to apparatus, the surrounding environment or services and using sustainable energy practices
- Check quality of assembled bus bars.
- Established OHS risk control measures for work completion are followed
- Quality of bus bar assembly is checked against work instructions and industry standards and in accordance with established routines
- Prescribed solutions are used where corrective actions to assembled components are necessary
- Work report forms are completed accurately and appropriate person(s) notified in accordance with established routine