Elements and Performance Criteria
- Prepare to design integrated systems.
- OHS processes and procedures for a given work area are identified, obtained and understood.
- The extent and nature of the integrated system is determined from design brief.
- Safety and other regulatory requirements to which the electrical installation shall comply area are identified, obtained and understood.
- Design development work is planned to meet scheduled timelines in consultation with others involved in the installation or associated work.
- Functions of the integrated system are determined from job specifications and/or and documented through discussions with appropriate person(s).
- Develop integrated systems design.
- Knowledge of integrated systems, building services installation performance standards, compliance methods and service equipment is applied to designing the integrated system.
- Alternative arrangements for the installation design are considered based on the requirements outlined in the design brief.
- System installation requirements, equipment and programming for the integrated system are incorporated into the design.
- Safety, functional and budgetary considerations are incorporated in the installation design.
- System design draft is checked for compliance with the design brief and regulatory requirements.
- System design is documented for submission to appropriate person(s) for acceptance and approval.
- Solutions to unplanned situation are provided consistent with organisation's policy.
- Obtain approval for design.
- System design is presented and explained to client representative and/or other relevant person(s).
- Requests for alterations to the design are negotiated with relevant person(s) within the constraints of organisation's policy.
- Final design is documented and approval obtained from appropriate person(s).
- Quality of work is monitored against personal performance agreement and/or established organisational or professional standards.