Elements and Performance Criteria
- Prepare to commission computer systems
- OHS procedures for a given work area are obtained and understood.
- Established OHS risk control measures and procedures in preparation for the work are followed.
- Safety hazards that have not previously been identified are noted and established risk control measures are implemented.
- Appropriate personnel are consulted to ensure the work is co-ordinated effectively with others involved on the work site.
- System operating parameters are identified by reviewing system specifications and component technical data.
- Tools, equipment, applications, and testing devices needed for the work are obtained in accordance with established procedures and checked for correct operation and safety.
- Preparatory work is checked to ensure no unnecessary damage has occurred and complies with requirements.
- Circuits are checked as being isolated, where necessary, in strict accordance OHS requirements and procedures.
- Commission computer systems.
- OHS risk control measures and procedures for carrying out the work are followed.
- Testing/measuring devices are connected and set up in accordance with requirements for a particular system.
- Measurements and adjustments are made to computer equipment to provide optimum system performance in accordance with system specifications and/or regulatory requirements.
- Decisions for dealing with unexpected situations are made from discussions with appropriate persons and job specifications and requirements.
- Methods for dealing with unexpected situations are selected on the basis of safety and specified work outcomes.
- Systems' commissioning procedures are performed in accordance with requirements.
- Commissioning is carried out efficiently without unnecessary waste of materials or damage to apparatus, the surrounding environment or services and using sustainable energy principles.
- Completion and report commissioning activities.
- OHS risk control work completion measures and procedures are followed.
- Adjustment settings are documented in accordance with established procedures.
- Work site is cleaned and made safe in accordance with established procedures.
- Commissioning results and work completion are notified to appropriate person or persons in accordance with established procedures