Elements and Performance Criteria
- Prepare to provide solutions for the uses of materials and thermodynamics.
- OHS procedures for a given work area are obtained and understood
- OHS risk control work preparation measures and procedures are followed.
- The nature of the problem is obtained from documentation or from work supervisor to establish the scope of work to be undertaken.
- Advice is sought from the work supervisor to ensure the work is coordinated effectively with others.
- Sources of equipment and products that may be required for the work are established in accordance with established procedures.
- Tools, equipment and testing devices necessary for the work are obtained and checked for correct operation and safety.
- Provide solutions for the uses of materials and thermodynamics.
- OHS risk control work measures and procedures are followed.
- The need to test or measure active systems is determined in strict accordance with OHS requirements and when necessary conducted within established safety procedures
- Systems are checked as being isolated where necessary in strict accordance OHS requirements and procedures
- Established methods are used to solve system problems from measure and calculated values, as they apply to materials and thermodynamics.
- Unexpected situations are dealt with safely and with the approval of an authorised person.
- Problems are solved without damage to apparatus, circuits, the surrounding environment or services and using sustainable energy practices with the minimum waste and rework.
- Complete work and document solutions to discovered problem.
- OHS work completion risk control measures and procedures are followed.
- Work site is cleaned and made safe in accordance with established procedures.
- Justification for solutions used to solve system problems is documented.
- Work completion is documented and appropriate person(s) notified in accordance with established procedures.