Elements and Performance Criteria
- Prepare to install aerial communication cables
- OHS procedures for a given work area are identified, obtained and understood.
- Health and safety risks are identified and established risk control measures and procedures are followed in preparation for the work.
- Safety hazards that have not previously been identified are noted and established risk control measures are implemented.
- Cabling installation is prepared in consultation with others affected by the work and sequenced appropriately.
- The nature and location of the work is determined from documentation or in discussion with appropriate person(s) to establish the scope of work to be undertaken.
- Cable routes are planned within the constraints of the precinct, structure, significants and regulations.
- Advice is sought from appropriate persons to ensure the work is coordinated effectively with others.
- Material needed for the installation work is obtained in accordance with established procedures and checked against job requirements.
- Tools, equipment and testing devices needed to for the installation work are obtained in accordance with established procedures and checked for correct operation and safety.
- Preparatory work is checked to ensure no damage has occurred and that it complies with requirements.
- Install aerial communication cables.
- OHS risk control measures and procedures for carrying out the work are followed.
- Poles are checked for soundness in accordance with established procedures.
- Catenary cables are installed ensuring sufficient clearances are maintained in compliance with requirements.
- Cables are attached to the catenary without strain or damage.
- Cable ends are protected from damage in preparation for termination.
- Established methods for dealing with unexpected situations are discussed with appropriate person(s) and documented.
- Unexpected situations are dealt with safely and with the approval of an authorised person.
- Ongoing checks of the quality of installed aerial communication cables are undertaken in accordance with established procedures.
- Cable installation is carried out efficiently without waste of materials or damage to apparatus, circuits or the surrounding environment and using sustainable energy practices.
- Document and verify cabling installation