Elements and Performance Criteria
- Prepare to select equipment.
- Arrange locations of equipment and cable routes.
- Location of equipment is arranged to comply with job specifications and regulatory requirements.
- Cable routes are planned to ensure maximum lengths specified by standards and the manufacturer are not exceeded.
- Cable routes are planned to comply with job specifications and regulatory requirements.
- Earthing is arranged to comply with job specifications and regulatory requirements.
- Select cables and equipment.
- Cables types are selected for suitability for the environments in which they are to be installed, performance required, and regulatory requirements.
- Cable sizes are selected to meet capacity and performance requirements.
- Earthing components are selected to meet regulatory and earthing requirements.
- Evidence is obtained that network equipment selected complies with safety requirements.
- Electronic equipment types are selected for suitability for the environments in which they are to be installed, performance required, and regulatory requirements.
- Document communications network.