Elements and Performance Criteria
- Prepare to design and develop modifications to electrical machines.
- OHS procedures for a given work area are identified, obtained and understood.
- The extents of modifications required are determined from performance test results and customer's requirements.
- Original specification documents for the machine are sought and received in order to check currency of compliance requirements. (see note 1)
- Activities are planned to meet scheduled timelines in consultation with others involved in or relying on outcomes of the work.
- Design modifications to electrical machines.
- OHS risk control measures and procedures for carrying out the work are followed.
- In depth knowledge of electrical machine and sustainable energy policies in improving machine efficiency is applied to modification design.
- Modifications are designed to comply with the requirements of Standards and regulations.
- Acceptance/approval for modification design is sought from appropriate person(s) in accordance with established procedures.
- Specifications and instructions for the modification work are documented and processed in accordance with requirements.
- Solutions to unplanned or unforeseen events are provided consistent with safety and work outcomes.
- Arrange modification work.
- OHS risk control measures and procedures for carrying out the work are followed.
- Arrangements are made for the modification work to be done in accordance with established procedures.
- A copy of modification specifications and instructions is provided to personnel responsible for carrying out the work.
- Strategies are implemented that verify that modification conforms to specifications.
- Solutions to unplanned or unforeseen events are provided consistent with safety and work outcomes.
- Complete work and report
- OHS work completion risk control measures and procedures are followed.
- Arrangements are made for formal certification of modifications where required by regulation or customer.
- Machine marking is revised to comply with performance parameters resulting from modifications.
- Modification and machine performance standard are documented and report issued to appropriate person(s) in accordance with established procedures.