Elements and Performance Criteria
- Prepare to align and install lift equipment.
- OHS procedures for a given work area are identified, obtained and understood.
- OHS risk control measures and procedures in preparation for the work are followed.
- The likely extend of work to be undertaken is envisaged from site plans, drawings and specifications and/or discussions with appropriate person(s).
- Advice is sought from the work supervisor to ensure the work is coordinated effectively with others.
- Tools, equipment and alignment devices needed to carry out the work are obtained in accordance with established procedures and checked for correct operation and safety.
- Align and Install lift equipment.
- OHS risk control measures and procedures for carrying out the work are followed.
- The need to test or measure live is determined in strict accordance with OHS requirements and when necessary conducted within established safety procedures.
- Circuits/machines/plant are checked as being isolated where necessary in strict accordance OHS requirements and procedures.
- Equipment are installed straight and square in the required locations and within acceptable tolerances.
- Equipment align and install in accordance with manufacture's specifications and regulatory requirements.
- Established methods for dealing with unexpected situations are discussed with appropriate person or persons and documented.
- Unexpected situations are dealt with safely and with the approval of an authorised person.
- Ongoing checks of the quality of installed equipment are undertaken in accordance with established procedures.
- Equipment installation is carried out efficiently without unnecessary waste of materials or damage to apparatus, circuits or the surrounding environment and using sustainable energy practices.
- Completion and report of alignment and installation activities
- OHS work completion risk control measures and procedures are followed.
- Work site is cleaned and made safe in accordance with established procedures.
- Final checks are made to that the installed equipment conforms to requirements.
- 'As-installed' equipment is documented and an appropriate person or persons notified in accordance with established procedures.