Elements and Performance Criteria
- Prepare to set up audio/video equipment.
- OHS procedures for a given work area are identified, obtained and understood through established routines and procedures.
- Established OHS risk control measures and procedures are followed in preparation for the work.
- Safety hazards that have not previously been identified are reported and advise on risk control measures are sought from the work supervisor.
- Details of the system are obtained from purchase documentation or from work supervisor to establish the scope of work to be undertaken.
- Advice is sought from the work supervisor to ensure the work is co-ordinated effectively with others.
- Materials that may be required for the work are obtained and checked in accordance with routines and procedures.
- Tools and testing devices needed to carry out the work are obtained and checked for correct operation and safety.
- Set up audio/video equipment.
- Established OHS risk control measures and procedures for carrying out the work are followed.
- The need to test or measure live is determined in strict accordance with OHS requirements and when necessary conducted within established safety procedures.
- Circuits/components are checked as being isolated where necessary in strict accordance OHS requirements and procedures.
- System components are unpacked to ensure they are complete and undamaged.
- System components are placed for optimum performance within constrains imposed by the area and customer.
- Systems components are connected in accordance with manufacturer's instructions.
- System functions are set to customer's requirements and tested for correct operation.
- Procedures for referring non-routine events to immediate supervisor for directions are followed.
- System set up is carried out efficiently without waste of materials or damage to apparatus and the surrounding environment or services and using sustainable energy practices.
- Complete system set up and report.
- OHS risk control work completion measures and procedures are followed.
- Work area is cleaned and made safe in accordance with established routines.
- All system/component documentation is handed over to the customer.
- Work supervisor is notified of the completion of the work in accordance with established routine.