Elements and Performance Criteria
- Prepare to install audio/video components and systems.
- OHS procedures for a given work area are identified, obtained and understood through established routines.
- Established OHS risk control measures are followed in preparation for the work.
- Safety hazards, which have not previously been identified, are reported and advise on risk control measures, are sought from the work supervisor.
- The nature and location of the work is obtained from work supervisor or other appropriate person to establish the scope of work to be undertaken.
- Advice is sought from the work supervisor and/or other appropriate person to ensure the work is co-ordinated effectively with others.
- Sources of materials that may be required for the work are established in accordance with established routines.
- Tools, equipment and testing devices needed to carry out the work are obtained and checked for correct operation and safety.
- Install audio/video components and systems.
- Established OHS risk control measures for carrying out the work are followed.
- Circuits/components are checked as being isolated where necessary in strict accordance OHS requirements and procedures.
- Audio/video components are installed to comply to standards and job specifications with sufficient excess to affect terminations.
- Accessories are installed straight and square in the required locations and within acceptable tolerances.
- Cables and conductors are terminated at accessories in accordance with manufacture’s specifications and regulatory requirements.
- Procedures for referring non-routine events to immediate supervisor for directions are followed.
- The installation is carried out efficiently without waste of materials or damage to apparatus, circuits or the surrounding environment and using sustainable energy practices.
- Complete installation work and report.