Elements and Performance Criteria
- Prepare to install and test microwave antennae and waveguides.
- OHS procedures for a given work area are identified, obtained and understood through established routines.
- Established OHS risk control measures are followed in preparation for the work.
- Safety hazards that have not previously been identified are reported and advise on risk control measures are sought from the work supervisor.
- The nature and location of the work is obtained from work supervisor or other appropriate person to establish the scope of work to be undertaken.
- Advice is sought from the work supervisor and/or other appropriate person to ensure the work is co-ordinated effectively with others.
- Sources of materials that may be required for the work are established in accordance with established routines.
- Tools, equipment and testing devices needed to carry out the work are obtained and checked for correct operation and safety.
- Install microwave antennae and waveguides.
- Established OHS risk control measures for carrying out the work are followed.
- Circuits/components are checked as being isolated where necessary in strict accordance OHS requirements and procedures.
- Antennas are installed in their specified locations and within limitation imposed by regulation.
- Hardware and accessories are installed straight and square in the required locations and within acceptable tolerances.
- Cables and conductors are terminated at accessories in accordance with manufacture’s and job specifications and regulatory requirements
- Procedures for referring non-routine events to immediate supervisor for directions are followed.
- The installation is carried out efficiently without waste of materials or damage to apparatus, circuits or the surrounding environment and using sustainable energy practices.
- Test microwave antennae and waveguides and report.
- OHS work completion risk control measures and procedures are followed.
- Pre-commissioning adjustments are made to the installation and the system to optimise performance in accordance with system specification.
- Work site is cleaned and made safe in accordance with established procedures.
- Work supervisor is notified of the completion of the installation work in accordance with established routines.