Elements and Performance Criteria
- Prepare to develop integrated security systems
- OHS processes and procedures for a given work area are identified, obtained and understood.
- Established OHS risk control measures and procedures are followed in preparation for the work.
- The extent of the proposed integrated security system is determined from the system specification or in consultations with appropriate person(s)
- Development work is planned to meet scheduled timelines in consultation with others involved on the work site
- Develop integrated security system plan
- Knowledge of common security scenarios and security network standards and protocols, network topology, physical media and disaster planning is applied to the system plan.
- Alternative system arrangements are considered based on the requirements job specification.
- Safety, functional and budget considerations are incorporated in the system plan.
- System draft plan is checked for compliance with the job specifications and regulatory requirements.
- System plan is documented for submission to appropriate person(s) for approval
- Decisions for dealing with unexpected situations are made from discussions with appropriate persons and job specifications and requirements.
- Obtain approval for system plan
- System design is forwarded to client representative and/or other relevant person(s) for approval.
- Requests for alterations to the plan are negotiated with relevant person(s) in accordance with established procedures.
- Final system plan is documented and approval obtained from appropriate person(s).
- Quality of work is monitored against personal performance agreement.