Elements and Performance Criteria
- Prepare to develop an interfaces for multiple access methods of integrated system
- The extent of the various services in the integrated system determined from the systems data base and customer requirements.
- Control parameters are determined from the integrated systems data base and confirmed with the customer.
- Programming software tools and project data are down loaded to a compatible PC and checked
- Manufacturer’s instruction for installing and connecting gateway equipment are read and understood.
- Develop an interface for multiple access of integrated systems
- OHS risk control work measures and procedures are followed.
- Knowledge of IT network accessing integrated system programming methods are used in programming multiple access control.
- Functions and parameters of integrated system services are programmed in accordance with manufacturer’s instruction and to customer requirements.
- Gateway equipment installation and connectivity is implemented in accordance with manufacturer’s instruction and regulatory requirements.
- Back up, transfer and test system access
- OHS work completion risk control measures and procedures are followed.
- Programmed access, functions and parameters are backed up and transfer to the system following manufacturer’s instructions.
- Programmed access methods tests are conducted to verify compatibility and compliance with the integrated system and customer requirements.
- Non-compliance operations and anomalies are corrected to comply with manufacturer’s and customer requirements.
- A copy of the documentation of the as-programmed multiple access specifications are given the client or client’s representative.