Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Prepare to install LV wind energy conversion systems.
  2. Install LV wind energy conversion systems.
  3. Complete installation and report installation activities.

Required Skills

This describes the essential skills and knowledge and their level required for this unit

Evidence shall show that knowledge has been acquired of safe working practices and installing LV wind energy conversion systems

All knowledge and skills detailed in this unit should be contextualised to current industry practices and technologies

KSEKA

Installation and maintenance of LV WECS

Evidence shall show an understanding of installation and maintenance of small LV WECS to the extent indicated by the following aspects

Installation of a LV WECS encompassing

selection of an appropriate tower for the installation of a WECS taking into consideration soil type and footings local council approvals appropriate codes such as AS transport of tower

appropriate methods using appropriate safety procedures for raising tower and WECS lightning protection tower maintenance safety in the erection and maintenance of the tower and WECS site management to minimise environmental impacts

appropriate electrical transmission voltage and cable size from the WECS to the load or energy storage

appropriate installation commissioning fault diagnosis and rectification using appropriate safety procedures This will include WECS power output voltage regulation and transmission cable voltage drop manual and automatic furling shutdown

schematic and wiring diagrams for the WECS showing the general circuit layout and protection between the WECS energy storage inverter and loads according to ASNZS AS and lightning protection requirements

suitable layout for the location of energy storage to meet ASNZS AS and AS

safety procedures for the installation commissioning fault diagnosis of system components

Maintenance of a LV WECS encompassing

appropriate methods using appropriate safety procedures tower maintenance safety

appropriate maintenance methods using appropriate safety procedures This will include WECS power output voltage regulation and transmission cable voltage drop manual and automatic furling shutdown

safety procedures for the maintenance of system components

maintenance schedule for the system

Evidence Required

This provides essential advice for assessment of the unit of competency and must be read in conjunction with the performance criteria and the range statement of the unit of competency and the Training Package Assessment Guidelines

The Evidence Guide forms an integral part of this Competency Standard Unit and shall be used in conjunction with all components parts of this unit and performed in accordance with the Assessment Guidelines of this Training Package

Overview of Assessment

Longitude competency development approaches to assessment such as Profiling require data to be reliably gathered in a form that can be consistently interpreted over time This approach is best utilised in Apprenticeship programs and reduces assessment intervention It is the Industrys preferred model for apprenticeships However where summative or final assessment is used it is to include the application of the competency in the normal work environment or at a minimum the application of the competency in a realistically simulated work environment It is recognised that in some circumstances assessment in part or full can occur outside the workplace However it must be in accord with Industry and Regulatory policy in this regard

Methods chosen for a particular assessment will be influenced by various factors These include the extent of the assessment the most effective locations for the assessment activities to take place access to physical resources additional safety measures that may be required and the critical nature of the competencies being assessed

The critical safety nature of working with electricity electrical equipment gas or any other hazardous substancematerial carries risk in deeming a person competent Hence sources of evidence need to be rich in nature so as to minimise error in judgment

Activities associated with normal every day work have a bearing on the decision as to how much and how detailed the data gathered will contribute to its richness Some skills are more critical to safety and operational requirements while the same skills may be more or less frequently practiced These points are raised for the assessors to consider when choosing an assessment method and developing assessment instruments Sample assessment instruments are included for Assessors in the Assessment Guidelines of this Training Package

Critical aspects of evidence required to demonstrate competency in this unit

Before the critical aspects of evidence are considered all prerequisites shall be met

The evidence on which competency in this unit is based shall be considered holistically for each element on at least two occasions comprising

A representative body of work performance demonstrated within the timeframes typically expected of the discipline work function and industrial environment In particular this shall incorporate evidence that shows a candidate is able to

Implement Occupational Health and Safety workplace procedures and practices including the use of risk control measures as specified in the performance criteria and range and

Apply sustainable energy principles and practices as specified in the performance criteria and range and

Demonstrate an understanding of the essential knowledge and associated skills as described in this unit It may be required by some jurisdictions that RTOs provide a percentile graded result for the purpose of regulatory or licensing requirements and

Demonstrate an appropriate level of skills enabling employment and

Conduct work observing the relevant Anti Discrimination legislation regulations polices and workplace procedures and

Demonstrated performance across a representative range of contexts from the prescribed items below

Install and set up WECS for LV applications as listed in the Range statement and including

A

Assessing customer energy requirements efficiency improvements and site limitations

B

Reading and interpreting drawings related to and apparatus locations and circuit connections

C

Placing and securing system components accurately

D

Maintaining fire integrity

E

Connecting system LV components to comply with requirements

F

Testing and commissioning system operation and verifying compliance with standards and job specifications

G

Completing necessary documentation including handing over system operational documents to the customer

H

Dealing with unplanned events by drawing on essential knowledge and skills to provide appropriate solutions incorporated in the holistic assessment with the above listed items

Context of and specific resources for assessment

This unit should be assessed as it relates to normal work practice using procedures information and resources typical of a workplace This should include

OHS policy and work procedures and instructions

Suitable work environment facilities equipment and materials to undertake actual work as prescribed by this competency standard unit

Resources required to assess this unit are listed above in Context of assessment which should also be used in the formal learningassessment environment

Note Where simulation is considered a suitable strategy for assessment it must ensure that the conditions for assessment are authentic and as far as possible reproduce and replicate the workplace and is consistent with the approved industry simulation policy

Note:
Where simulation is considered a suitable strategy for assessment it must ensure that the conditions for assessment are authentic and as far as possible reproduce and replicate the workplace and is consistent with the approved industry simulation policy.

The resources used for assessment should reflect current industry practices in relation to installing wind energy conversion systems for LV applications

Method of assessment

This competency standard unit shall be assessed by methods given in Volume Part Assessment Guidelines

Note

Competent performance with inherent safe working practices is expected in the Industry to which this competency standard unit applies This requires that the specified essential knowledge and associated skills are assessed in a structured environment which is primarily intended for learningassessment and incorporates all necessary equipment and facilities for learners to develop and demonstrate the essential knowledge and skills described in this unit

Concurrent assessment and relationship with other units

For optimisation of training and assessment effort competency development in this unit may be arranged concurrently with unit

UEENEEKA

UEENEEK130A

Solve problems in wind energy conversion systems rated up to kW


Range Statement

10) This relates to the unit of competency as a whole providing the range of contexts and conditions to which the performance criteria apply. It allows for different work environments and situations that will affect performance.

This competency standard unit shall be demonstrated by completing the installation of wind energy conversion systems for LV applications for one mainstream type of WECS on at least two occasions.

Generic terms are used throughout this Vocational Standard shall be regarded as part of the Range of Variables in which competency is demonstrated. The definition of these and other terms that apply are given in Volume 2, Part 2.1.