Elements and Performance Criteria
- Prepare to install and maintain non-vital screen based control systems
- OHS procedures for a given work area are identified, obtained and understood.
- Established OHS risk control measures and procedures are followed in preparation for the work.
- The extent of maintenance is determined from maintenance schedules, job specifications, drawings and regulatory requirements
- Appropriate personnel are consulted to ensure the work is coordinated effectively with others involved on the work site
- Materials needed for maintenance and repair work are obtained in accordance with established procedures and checked against job requirements
- Tools, equipment and testing devices needed to maintenance and repair work are obtained in accordance with established procedures and checked for correct operation and safety.
- Install and maintain non-vital screen based control systems
- OHS risk control measures and procedures for the installation and maintenance of non-vital screen based control systems are followed.
- Non-vital screen based control systems are installed and maintained to comply with technical standards and job specifications and requirements.
- Installation and maintenance, fault finding and repairs are performed efficiently without waste of materials or damage to apparatus and the surrounding environment or services and using sustainable energy practices.
- System faults are verified using appropriate technical information, fault finding and diagnostic techniques to identify faulty control equipment.
- Faulty modules are replaced, adjusted and secured in accordance with manufacturer specifications and organisation procedures.
- Methods for dealing with unexpected situations are selected on the basis of safety and specified work outcomes.
- Complete the installation and maintenance of non-vital screen based control systems
- OHS risk control measures and procedures for carrying out the work are followed.
- Control equipment is adjusted and tested using appropriate test procedures and equipment to ensure it operates within the specified technical parameters.
- System faults identified beyond the scope of first level maintenance are reported for follow-up action.
- Test results are documented in accordance with organisation requirements and faulty or replaced module(s) are tagged and dispatched to maintain equipment spares, and relevant reports produced