Elements and Performance Criteria
- Plan and prepare to attach flexible cable(s) and plug(s).
- Work is planned and prepared to ensure OHS policies and procedures are followed, and the work is appropriately sequenced in accordance with requirements.
- Condition and ratings under which the flexible cable(s) and plug(s) is to operate is determined from requirements and in consultation with appropriate personnel followed by written instruction.
- Flexible cable(s) and plug(s) are selected to comply with standards and requirements for the condition and rating to be determined.
- Materials necessary to complete the work are obtained in accordance with established procedures and checked against job requirements.
- Tools, equipment and testing devices needed to carry out the work are obtained in accordance with established procedures and checked for correct operation and safety.
- Attach flexible cable(s) and plug(s).
- OHS policies and procedures are followed.
- Flexible cable(s) is prepared without damage to insulation and conductors and in accordance with requirements.
- Equipment is earthed in accordance with requirements and as confirmed as de-energised.
- Visual checks of the electrical equipment and associated wiring are carried out in accordance with established procedures to detect any abnormal or obvious damage or fault.
- Approval is obtained in accordance with established procedures from appropriate personnel, before any contingencies are implemented.
- The integrity of insulated equipment is maintained in accordance with requirements.
- Conductors are connected to terminals in accordance with requirements to ensure the required polarity is affected.
- Test equipment for operation and safety.
- Provide status report(s).