Elements and Performance Criteria
- Prepare to analyse psychrometric performance of HVAC/R system
- WHS/OHS risk control measures and workplace procedures are followed in preparation for HVAC/R work
- Extent of the psychrometric issues are determined from performance specifications and situation reports and in consultation with relevant person/s
- HVAC/R activities are planned to meet scheduled timelines in consultation with other person/s involved in the work
- Strategies are formed to ensure HVAC/R analysis and solution implementation is carried out efficiently in accordance with workplace procedures
- Analyse psychrometric performance of HVAC/R system
- Psychrometric principles are applied to analytical solutions to HVAC/R system
- Parameters, specifications and performance requirements in relation to HVAC/R system are obtained in accordance with workplace procedures
- Analysis of HVAC/R psychrometric parameters is carried out to provide effective solutions
- Unplanned situations are responded to in accordance with regulatory requirements and workplace procedures in a manner that minimises risk to personnel and equipment
- Quality of work is monitored against performance agreement and/or workplace procedures and industry standards
- Document and report results of the HVAC/R psychrometric performance analysis and actions taken
- HVAC/R analysis is documented and includes details of findings, calculations and assumptions
- HVAC/R analysis is reported to appropriate person/s to determine appropriate action to be taken based on findings
- Justification for findings and any actions to be undertaken in relation to the HVAC/R equipment is documented for inclusion in work/project or development records in accordance with industry standards and workplace procedures