Elements and Performance Criteria
- Prepare to design industrial refrigeration systems
- Scope of the refrigeration system is determined from design specifications
- Safety and systems are identified, obtained and applied in accordance with relevant industry standards
- Work supervisor and/or customer/s are consulted to determine functions and parameter of the system required in accordance with design specifications and workplace documentation
- Design development work is planned in accordance with workplace procedures for timelines in consultation with others involved
- Design industrial refrigeration systems
- Relevant refrigeration and food storage technology, refrigeration system components and piping are applied to developing the system design in accordance with workplace procedures and relevant industry standards
- Safety, functionality and budgetary considerations are incorporated in the installation design
- Equipment required is selected in accordance with the design specifications and workplace procedures
- Location of components are documented in accordance with workplace procedures and operation of system functions
- System design draft is checked for compliance in accordance with the design brief and relevant industry standards
- System design is documented and submitted to relevant person/s for approval
- Unplanned events are dealt with in accordance with problem-solving techniques and workplace procedures
- Obtain approval for industrial refrigeration design
- Requests for alterations to the design are negotiated with relevant person/s in accordance with workplace procedures
- Final design is documented and approval obtained from relevant person/s
- Quality of work is monitored in accordance with workplace procedures and relevant industry standards