Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Prepare to develop HVAC/R specifications and prepare drawings
  2. Extent of the project scope is determined from design brief and/or relevant documentation and from discussions with appropriate person/s
  3. Appropriate person/s is consulted to ensure the work is coordinated effectively with others involved in the work
  4. Information technology and software tools and equipment needed for the HVAC/R work are obtained in accordance with workplace procedures
  5. Develop HVAC/R specifications and prepare drawings
  6. HVAC/R specifications are developed to include necessary performance requirements for components and system
  7. Risk management strategies for the HVAC/R project are sought and obtained for incorporating in the specification
  8. Appropriate information technology and software tools are used to develop HVAC/R specifications and produce drawings based on standard protocols
  9. HVAC/R project specifications and drawings are reviewed against project inputs and adjusted to rectify any anomalies
  10. HVAC/R project specifications and drawings are documented in accordance with workplace policies and procedures
  11. Solutions to unplanned situation are provided in accordance with workplace policies
  12. HVAC/R work quality is monitored against performance agreement and/or organisational or industry standards
  13. Obtain approval for HVAC/R specifications and drawings
  14. Alterations to the project specifications and drawings resulting from the presentation/discussion are negotiated with relevant person/s in accordance with organisation policies
  15. Final HVAC/R project specifications and drawings are documented and approval obtained from appropriate person/s

Performance Evidence

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements, performance criteria and range of conditions on at least one occasion and include:

determining the project requirements accurately

establishing source and availability of components appropriately, including the performance requirements of components and the system and risk management strategies in the specifications

negotiating alterations to the project specifications and drawings successfully

documenting project specifications and drawings in accordance with organisation policies and procedures

obtaining approval for the completed project specifications and drawings

dealing with unplanned events

applying relevant work health and safety (WHS)/occupational health and safety (OHS) requirements workplace procedures and practices, including using risk control measures

applying sustainable energy principles and practices

developing specifications and preparing drawings for heating, ventilation and air conditioning/refrigeration (HVAC/R) system projects, including:

using appropriate information technology in accordance with workplace procedures.


Knowledge Evidence

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements, performance criteria and range of conditions and include knowledge of:

specification development - specification writing; safe working practices and relevant standards, codes and regulations, including:

purpose and nature of specification

performance based specifications

prescriptive specifications

acceptable evidence of compliance

additional service required with the supply of equipment

dealing with suppliers and manufacturer’s

documenting specification

computer-aided drafting (CAD):

specific procedures:

creating symbols for library files

program specific commands

speed enhancement

configuring the digitising tablet

methodology for creating layers:

name

colour

line type

methodology for drawing variables:

limits

grid

snap

dimensions

text

units

ISO drawing sheets

advanced drawings

multiple three-dimensional views:

setting up environment on screen

top view

front and side views

three-dimensional views

movement through space:

draw on any created views

relocate coordinate system as necessary

creation of views:

creation of three-dimensional geometric shapes

creation of three-dimensional complex view by:

manipulation of drawing planes

location of geometric shapes

editing:

use of function to facilitate modification of geometric shapes in completion of a three-dimensional view

display of three-dimensional view:

wire line

solid face

isometric

perspective

orthographic:

saving:

use of assembly drawing file for plotting

design brief requirements

information technology

relevant manufacturer specifications

relevant safe work method statements (SWMS)/job safety assessments or risk mitigation processes

relevant WHS/OHS legislated requirements

relevant workplace policies and procedures.