Elements and Performance Criteria
- Prepare to diagnose and rectify faults
- Details of the air conditioningor refrigerationsystem faultare obtained from documentation, clientand/or from supervisor to establish scope of work to be completed
- Advice is sought from supervisor, as required, to ensure work is coordinated with others
- Sources of materials required for work are accessed in accordance with workplace procedures
- Tools, equipment and testing devices are obtained in accordance with workplace procedures and checked for operational safety
- Circuits/machines and/plant are checked as being isolated, where necessary, in accordance with workplace procedures and WHS/OHS requirements
- Fault finding, using measured and calculated values of system and component parameters, is undertaken methodically in accordance with workplace procedures
- Faults, beyond the scope of refrigeration and air conditioning system work, are identified and reported in accordance with workplace procedures
- Control system components are dismantled, where necessary, and parts safely stored to protect them against loss or damage in accordance with workplace procedures
- Faulty components are rechecked and fault status is confirmed
- Unexpected situations are resolved in accordance with workplace procedures, safety guidelines and with the approval of an authorised person/supervisor
- Fault-finding activities are completed without damage to apparatus, circuits, the surrounding environment and/or services using relevant sustainable energy practices in accordance with workplace procedures
- Equipment is checked as being isolated, where necessary, in accordance with workplace procedures and WHS/OHS requirements
- Materials required are obtained in accordance with workplace procedures
- Repairs are completed without damage to other components or apparatus using sustainable energy principles in accordance with workplace procedures
- Effectiveness of repair work is tested in accordance with workplace procedures
- Air conditioning and refrigeration control system is reassembled, given a final test and prepared for return to service in accordance with workplace procedures
- Complete and report fault-finding and rectification activities
- Report is completed in accordance with workplace procedures