Elements and Performance Criteria
- Prepare to install and commission flammable refrigerant refrigeration and air conditioning systems
- Safety hazards not previously identified are noted and risk control measures implemented
- Scope of work is determined from documentation and/or relevant person/s to establish work to be undertaken
- Component, equipment installation and commissioning work are sequenced in accordance with job schedule
- Relevant person/s is consulted to ensure the work is coordinated with others involved
- Materials required to install pipe work are obtained in accordance with workplace procedures and job specifications
- Tools, equipment and testing devices required to install and commission components and equipment are obtained in accordance with workplace procedures and checked for correct operation and safety
- System control settings and operating parameters are determined from job specifications
- Preparatory work is scheduled to ensure no damage has occurred in accordance with workplace procedures and relevant industry standards
- Install flammable refrigerant refrigeration and air conditioning systems
- Components and equipment are installed with sufficient access to affect electrical and pipe work connections and maintenance in accordance with relevant legislation, standards and code requirements, manufacturer instructions, job specificationsand workplace procedures
- Components and equipment are installed in the required locations and within acceptable tolerances in accordance with relevant legislation, standards and code requirements, manufacturer instructions, job specificationsand workplace procedures
- Refrigerant tubing and fittings are silver brazed with dry nitrogen to prevent contamination in accordance with relevant legislation, standards and code requirements, manufacturer instructions, job specificationsand workplace procedures
- Unplanned situations from installation of components and equipment are dealt with in accordance with workplace procedures
- Quality checks of pipe work, pressure testing and repair of leaks are conducted in accordance with relevant legislation, standard and code requirements, manufacturer instructions, job specificationsand workplace procedures
- Components and equipment are installed efficiently without waste of materials or damage/contamination to apparatus, the surrounding environment or services using sustainable energy practices
- Commission flammable refrigerant refrigeration and air conditioning systems
- System is charged with flammable refrigerant to the required level in accordance with relevant legislation, standard and code requirements, manufacturer instructions and job specification
- Refrigeration system pressure controls, valves and regulators are adjusted in accordance with relevant legislation, standard and code requirements, manufacturer instructions, job specificationsand workplace procedures
- Testing/measuring devices are used to observe operation of the refrigeration system and fine adjustments of controls made, as required, in accordance with relevant legislation, standard and code requirements, manufacturer instructions, job specificationsand workplace procedures
- Unplanned situations are dealt with safely and with the approval of relevant person/s
- Commissioning is conducted efficiently without waste of materials or damage to apparatus, the surrounding environment or services using sustainable energy practices
- Complete installation and commissioning work
- Final check of the installed components and equipment is made in accordance with relevant industry standards and job specifications
- 'As installed' components and equipment are documented and relevant person/s notified in accordance with workplace procedures
- Results of commissioning and final operating parameters are documented and relevant person/s notified in accordance with workplace procedures