Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Prepare to monitor and adjust energy management systems on refrigeration system
  2. WHS/OHS risk control measures and workplace procedures are followed in preparation for refrigeration system work
  3. Safety hazards not previously identified are noted on job safety assessment and established risk control measures implemented
  4. Appropriate person/s is consulted to ensure refrigeration system work is coordinated effectively with others involved on the worksite
  5. Refrigeration system energy parameters are identified by reviewing system specifications and component technical data
  6. Tools, equipment and testing devices needed to carry out work are obtained and checked for correct operation and safety
  7. Preparatory work is checked to ensure no damage has occurred and complies with job requirements
  8. Need to test or measure live electrical work is determined in accordance with WHS/OHS requirements and workplace safety procedures
  9. Circuits are checked and isolated in accordance with WHS/OHS requirements and workplace procedures
  10. Monitor and adjust energy management systems on refrigeration system
  11. Testing/measuring devices are connected and set up in accordance with job requirements and refrigeration system
  12. Monitoring and adjustments are made to equipment components and controls to provide effective energy use in accordance with refrigeration system specifications and regulatory requirements
  13. Unplanned situations are responded to in accordance with workplace procedures, discussions with appropriate person/s and job specifications and requirements in a manner that minimises risk to personnel and equipment
  14. Refrigeration system monitoring and adjusting is carried out efficiently without waste of materials or damage to apparatus, the surrounding environment or services using sustainable energy principles
  15. Complete and report monitoring adjusting activities
  16. Worksite is cleaned and made safe in accordance with workplace procedures
  17. Monitoring and adjustment settings are documented and appropriate person/s notified in accordance with workplace procedures

Performance Evidence

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements, performance criteria and range of conditions on at least one occasion and include:

identifying system energy parameters

monitoring and adjusting system components and controls to provide effective energy use

ensuring system energy use is accordance with requirements

documenting adjustment settings with established procedures

dealing with unplanned events

applying relevant work health and safety (WHS)/occupational health and safety (OHS) workplace procedures and practices requirements, including using risk control measures

applying sustainable energy principles and practices

monitoring and adjusting energy management systems on refrigeration system

planning, monitoring and adjusting energy management systems on refrigeration system.


Knowledge Evidence

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements, performance criteria and range of conditions and include knowledge of:

energy management systems for commercial refrigeration, safe working practices and relevant standards, codes and regulations, including:

functions of a commercial refrigeration energy management system, including:

general control function

inputs

outputs

communications

graphing

supervising

data logging

scheduling

alarms

power consumption

energy management system control components, including:

identify components

pressure sensors

temperature sensors

time clocks

humidity sensors

liquid level sensors

leak detector sensor

function and operating parameters of components

pressure sensors

temperature sensors

time clocks

humidity sensors

liquid level sensors

leak detector sensors

installation requirements and considerations, including:

installation of controller(s)

installation of refrigerant leak detector

systems

installation of accessory boards

installation of pressure transducers and wiring

installation of temperature sensors and wiring

control wiring considerations

system design and applications, including:

control components to suit given applications

system operating parameters

pressure sensors

temperature sensors

time clocks

humidity sensors

liquid level sensors

leak detector sensors

defrost

alarm panel

programming a control system, including:

display terminal and keypad functions

calibration of sensors

changing original settings

program a given set of parameters to suit an application

component testing and fault finding, including:

troubleshooting

testing of components

relevant job safety assessments or risk mitigation processes

relevant WHS/OHS legislated requirements

relevant workplace documentation

relevant workplace policies and procedures.