Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Prepare to produce HVAC/R control system diagrams
  2. WHS/OHS risk control measures and workplace procedures are followed in preparation for the work
  3. Scope of work is determined from project specifications and/or discussions with relevant person/s
  4. Relevant person/s is consulted to ensure the work is coordinated effectively with others involved on the worksite
  5. Software tools and equipment required for work are obtained in accordance with workplace procedures
  6. Produce HVAC/R control system diagrams
  7. Relevant control diagrams and layouts required are determined in accordance with project specifications
  8. Technical data of control system components is interpreted to determine parameters for inclusion in accordance with project specifications
  9. Relevant software tools are used to produce diagrams in accordance with project specifications
  10. Diagrams are checked for accuracy in accordance with project specifications and workplace procedures
  11. Unplanned events are dealt with in accordance with workplace procedures and safe work practices
  12. Complete and report HVAC/R control system diagrams
  13. Alterations, additions and/or corrective instructions are followed and diagrams are re-submitted for final approval in accordance with project specifications and workplace procedures
  14. Copies of completed diagrams are filed in accordance with workplace procedures

Performance Evidence

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements, performance criteria and range of conditions on at least one occasion and include:

understanding the extent of the drawing work accurately

determining appropriate types of diagrams and their layouts correctly

including appropriate technical data parameters in the diagrams

checking and correcting diagrams accurately

filing copies of completed drawing securely

dealing with unplanned events

applying relevant work health and safety (WHS)/occupational health and safety (WHS/OHS) requirements, including using risk control measures

completing and reporting heating, ventilation and air conditioning/refrigeration (HVAC/R) control system diagrams

preparing to produce HVAC/R control system diagrams

producing HVAC/R control system diagrams.


Knowledge Evidence

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements, performance criteria and range of conditions and include knowledge of:

HVAC/R control system fundamentals, safe working practices and relevant standards, codes and regulations, including:

control fundamentals:

control terminology

refrigeration system characteristics

HVAC system characteristics

control system characteristics

control system components

control system diagrams and symbols

product knowledge

types of control equipment:

electrical:

classification of circuits

two position control

floating control

sensors

controllers

flow control devices

control systems diagrams

electronic:

operating principles

sensors

controllers

control system diagrams

control systems applications:

refrigeration

air conditioning

air handling system controls

ventilation

heating

building airflow system control

airflow control

singles and multi-zones

chiller/boiler and distribution system control (chilled water, boiler and distribution systems)

relevant manufacturer specifications

relevant safe job safety assessments or risk mitigation processes

relevant software tools and equipment

relevant WHS/OHS legislated requirements

relevant workplace documentation

relevant workplace policies and procedures.