Elements and Performance Criteria
- Prepare to produce HVAC/R design drawings
- WHS/OHS risk control measures and workplace procedures in preparation for the work are followed
- Scope of work is determined from project specifications and/or discussions with relevant person/s
- Relevant person/s is consulted to ensure the work is coordinated effectively with others involved on the worksite
- Software tools and equipment required for work are obtained in accordance with workplace procedures
- Produce HVAC/R design drawings
- Relevant design drawings and layouts required are determined in accordance with project specifications
- Technical data of system components is interpreted to determine parameters for inclusion in accordance with project specifications
- Relevant software tools are used to produce drawings in accordance with project specifications
- Drawings are checked for accuracy in accordance with project specifications and workplace procedures
- Methods for dealing with unplanned events are conducted in accordance with workplace procedures and safe work practices
- Complete and report HVAC/R design drawings
- Alterations, additions and/or corrective instructions are followed and drawings are re-submitted for final approval in accordance with project specifications and workplace procedures
- Copies of completed drawings are filed in accordance with workplace procedures