Elements and Performance Criteria
- Prepare to service room air conditioner
- Extent of air conditioner work to be undertaken is determined from service/fault request and/or discussions with appropriate person/s
- Advice is sought from work supervisor to ensure servicing work is coordinated effectively with others
- Sources of materials/parts required for the servicing work are determined in accordance with workplace procedures
- Tools, equipment and testing devices needed to locate faults are obtained in accordance with workplace procedures and checked for correct operation and safety
- Service room air conditioner
- Air conditioner appliance is inspected, checked and isolated in accordance with WHS/OHS requirements and workplace procedures
- Safety hazards resulting from air conditioner defect or fault are documented and risk control measures devised and implemented in consultation with appropriate person/s
- Air conditioner appliances are tested for efficient operation and components affecting efficiency are inspected for wear or defects in accordance with industry standards, manufacturer service manuals and industry codes of practice
- Air conditioner appliance faults and their cause are determined through the application of refrigerated appliances and using measured and calculated values of appliance parameters
- Air conditioner appliance is dismantled, as required, and parts stored to protect against loss or damage
- Defective worn or faulty air conditioner appliance components are rechecked and their status confirmed
- Replacement parts required to rectify defects/faults are sourced and obtained in accordance with workplace procedures
- Effectiveness of the repair is inspected and tested in accordance with workplace procedures
- Air conditioner apparatus is reassembled, tested and prepared for return to service
- Unplanned situations are dealt with safely in accordance with workplace procedures and with the approval of authorised person/s in a manner that minimises risk to personnel and equipment
- Servicing activities are carried out without damage to apparatus, circuits, the surrounding environment or services using sustainable energy practices
- Complete and report fault-finding and repair activities
- Service report is completed and verified by appropriate person/s in accordance with workplace procedures