Elements and Performance Criteria
- Identify energy management techniques for electrical installations in buildings
- Hazards are identified, WHS/OHS risks assessed, and control measures and workplace procedures are implemented in preparation for work
- Scope of the energy management electrical design is determined from specifications of building and its services, plant and machinery and in consultation with relevant person/s
- Advice is sought from allied trade areas and component suppliers on required energy usage and system design in accordance with manufacturer specifications on energy usage for electrical control system
- Advice is sought from work supervisor to ensure work is coordinated effectively with relevant person/s
- Tools, testing devices and materials needed to carry out work are obtained and checked for correct operation and safety
- Design energy management controls for electrical installations
- Inspection, tests and measurements are carried out in accordance with WHS/OHS requirements and workplace procedures
- Energy use of building services, plant and machinery is obtained and applied to the energy management design control process
- Energy evaluation tests are set up in accordance with inspection and test methods and workplace procedures
- Strategies to reduce electrical system energy use without compromising occupancy standards are developed in accordance with energy management techniques and evaluation test results
- Unexpected situations are dealt with safely and effectively in accordance with workplace procedures and approval relevant person
- Design and electrical installation evaluation is carried out without unnecessary damage to systems circuits, the surrounding environment or services using sustainable energy practices
- Document energy management strategies to effectively reduce energy use in building
- Worksite is cleaned and made safe in accordance with workplace procedures
- Results of energy management design controls, recommended electrical installation strategies and their criterion for energy reduction are documented in accordance with workplace procedures
- Plans, wiring diagrams and specifications are completed and forwarded to relevant person/s