Elements and Performance Criteria
- Prepare to work on PV energy apparatus and systems
- Hazards are identified, risks are assessed, and control measures and workplace procedures are implemented
- Nature of apparatus/modules problem/s are identified from relevant documentation or work supervisor to determine the scope of work to be undertaken
- Advice is sought from work supervisor to ensure the work is coordinated effectively with others
- Materials required for the work are identified and accessed in accordance with workplace procedures
- Tools, equipment and testing devices needed for the work are obtained and checked for correct operation and safety in accordance with workplace procedures
- Solve problems in PV energy apparatus and systems
- Need to inspect, test or measure live work is determined and conducted, as required in accordance with job requirements and workplace safety procedures
- Circuits are checked and isolated in accordance with WHS/OHS requirements and workplace procedures
- Problem-solving techniques are used to solve PV energy modules problems using measured and calculated values of apparatus/modules operating parameters
- Problems are resolved without damage to apparatus/modules, circuits, the surrounding environment or services using sustainable energy practices
- Complete work and document problem-solving activities
- Worksite is cleaned and made safe in accordance with workplace procedures
- Justification for solutions used to resolve PV energy modules problems is documented in accordance with workplace procedures
- Work completion is documented and appropriate person/s notified in accordance with workplace procedures