Elements and Performance Criteria
- Prepare to check RAPS system use
- Risk control measures are applied in accordance with workplace procedures prior to commencing work
- Risks/hazards are identified, assessed, reported to relevant person/s and control measures implemented
- Nature and location of RAPS system is identified from relevant documentation or from relevant person/s to determine the scope of work
- Instructions for coordinating work with relevant personnel and the local community are obtained from relevant person/s and applied
- Materials required for the work are identified and accessed in accordance with workplace procedures
- Tools, equipment and testing devices required for work are obtained and checked for correct operation and safety
- Check use of RAPS system
- Need to test or measure live electrical work is determined in accordance with WHS/OHS requirements and conducted in accordance with workplace procedures
- Circuits/machines/plant are isolated in accordance with WHS/OHS requirements and workplace procedures
- RAPS system testing and checks are conducted in accordance with relevant workplace procedures
- Retrieval of performance data is completed safely and in accordance with workplace procedures
- Known types of functional faults are identified using fault-finding procedures
- Non-routine events are referred to relevant person/s for directions in accordance with workplace procedures
- Checking is conducted minimising waste of materials, energy, damage to apparatus, circuits, the surrounding environment and services
- Quality checks are conducted in accordance with workplace procedures
- Complete check of RAPS system and report outcomes
- Worksite is cleaned and made safe in accordance with workplace procedures
- Issues identified during checking are referred to the local community in accordance with workplace procedures
- Check results are reported to relevant person/s in accordance with check reporting and workplace procedures