Elements and Performance Criteria
- Determine stand-alone RE system
- Scope of the stand-alone RE system and electrical installation is determined from design brief
- Safety and regulatory requirements to which the electrical installation must comply are identified, obtained and applied
- Design development work is planned to meet scheduled timelines in consultation with relevant person/s involved in the stand-alone RE system installation or associated work
- Develop stand-alone RE system design
- Alternative stand-alone RE system designs are considered in accordance with the design brief
- Safety, functionality and budgetary considerations are incorporated in the stand-alone RE design
- Stand-alone RE system design is drafted and checked for compliance with the design brief and regulatory requirements
- Stand-alone RE system design is documented for submission to relevant person/s for acceptance and approval
- Unplanned situations are dealt with safely and effectively in accordance with workplace procedures
- Obtain design approval for stand-alone RE system
- Requests for alterations to the design are negotiated with relevant person/s within the constraints of workplace policies
- Final design is documented and approval obtained from relevant person/s
- Quality of work is monitored in accordance with relevant performance agreement and/or workplace procedures or industry standards