Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Prepare to install LV WECS
  2. WHS/OHS risks are identified and workplace procedures for risk control are applied in preparation for work
  3. Risks/hazards are identified, assessed, reported to relevant person/s and control measures implemented
  4. System installation is planned in consultation with others impacted by the work and sequenced appropriately
  5. Nature and location of the work are determined from documentation or relevant person/s to determine the scope of work
  6. Sitting limitations and customer system requirements are identified by consultation with the customer
  7. Suitable system components are specified and selected in accordance with workplace procedures
  8. Location of system components is planned within the constraints of the building structure and regulations
  9. Instructions for coordinating work with others are obtained from relevant person/s and applied
  10. Materials and components required are obtained in accordance with workplace procedures, pre-assembled, as required, and checked against job requirements
  11. Materials and components are prepared for transport to the site and transport is arranged in accordance with workplace procedures
  12. Tools, equipment and testing devices required are obtained in accordance with workplace procedures and checked for correct operation and safety
  13. Preparatory work is checked to ensure no unnecessary damage has occurred previously and complies with requirements
  14. Equipment is transported safely to the site in accordance with workplace procedures
  15. Need to test or measure live electrical work is determined in accordance with WHS/OHS requirements and conducted in accordance with workplace procedures
  16. Circuits/machines/plant are isolated in accordance with WHS/OHS requirements and workplace procedures
  17. System components are installed in compliance with technical industry standards, job specifications and requirements, and with sufficient access to enable terminations, adjustment and maintenance
  18. Wiring is terminated at components and associated equipment in accordance with manufacturer specifications and functional and regulatory requirements
  19. Unexpected events are discussed with relevant person/s, dealt with and documented in accordance with workplace procedures
  20. Unexpected situations are dealt with safely and with the approval of authorised person/s
  21. Quality checks of installed apparatus are conducted in accordance with workplace procedures
  22. System installation is completed minimising waste of materials, damage to apparatus, circuits, the surrounding environment and services using sustainable energy principles
  23. Complete installation and report installation activities
  24. Worksite is cleaned and made safe in accordance with workplace procedures
  25. Final checks are conducted to confirm installed apparatus conforms to requirements
  26. System operation is tested and installation verified as compliant with industry standards and work specifications
  27. 'As-installed' apparatus and associated equipment are documented and relevant person/s notified in accordance with workplace procedures
  28. Customer is informed of system operation, routine maintenance and limitations
  29. Documentation required by industry standards or job specifications is provided to the customer

Performance Evidence

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements and performance criteria on at least one occasion and include:

assessing customer energy requirements, efficiency improvements and site limitations

reading and interpreting drawings related to and apparatus locations and circuit connections

placing and securing system components accurately

maintaining fire integrity

connecting system low voltage (LV) components to comply with requirements

testing and commissioning system operation and verifying compliance with standards and job specifications

completing necessary documentation, including handing over system operational documents to the customer

dealing with unplanned events

applying relevant work health and safety (WHS)/occupational health and safety (OHS) requirements and workplace procedures and practices, including the use of risk control measures

applying sustainable energy principles and practices

checking isolation of circuits/machines/systems

coordinating work with relevant person/s

determining live electrical testing/measurement requirements

identifying and accessing materials, tools, equipment and testing devices

installing and setting up a mainstream type, wind energy conversion system (WECS) for LV application

transporting equipment.


Knowledge Evidence

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements and performance criteria and include knowledge of:

installation and maintenance of LV WECS, including:

installation of a LV WECS encompassing:

selection of an appropriate tower for the installation of a WECS taking into consideration soil type and footings, local council approvals, appropriate codes, AS/NZS 1170.2 Structural design actions - Wind actions, and transport of tower

appropriate methods and safety procedures for raising tower and WECS, lightning protection, tower maintenance, safety in the erection and maintenance of the tower and WECS, and site management to minimise environmental impacts

appropriate electrical transmission voltage and cable size from the WECS to the load or energy storage

appropriate installation, commissioning, fault diagnosis and rectification using appropriate safety procedures, including WECS power output, voltage regulation, and transmission cable voltage drop, manual and automatic furling, and shutdown

schematic and wiring diagrams for the WECS showing the general circuit layout and protection between the WECS, energy storage, inverter and loads according to AS/NZS 3000 Electrical installation (known as the Australian/New Zealand Wiring Rules), AS/NZS 4509 Stand-alone power systems, and lightning protection requirements

suitable layout for the location of energy storage to meet AS/NZS 3000 Electrical installation (known as the Australian/New Zealand Wiring Rules), AS 3011.1 Electrical installations - Secondary batteries installed in buildings - Vented cells and AS/NZS 4509 Stand-alone power systems

safety procedures for the installation, commissioning, fault diagnosis of system components

maintenance of a LV WECS encompassing:

appropriate methods and safety procedures for tower maintenance

appropriate maintenance methods and safety procedures, including WECS power output, voltage regulation, and transmission cable voltage-drop, manual and automatic furling, and shutdown

safety procedures for the maintenance of system components

maintenance schedule for the system

tower maintenance

relevant industry standards

relevant manufacturer specifications

relevant safe work method statements (SWMS)/job safety assessments or risk mitigation processes

relevant WHS/OHS legislated requirements

relevant workplace documentation

relevant workplace policies and procedures.