Elements and Performance Criteria
- Prepare to work on WECS
- Risk control measures are applied in accordance with workplace procedures prior to commencing work
- Nature of apparatus problem is identified from documentation or from relevant person/s to determine the scope of work
- Instructions for coordinating work with others is obtained from relevant person/s and applied
- Materials required for the work are identified and accessed in accordance with workplace procedures
- Tools, equipment and testing devices required to carry out work are obtained and checked for correct operation and safety
- Need to test or measure live electrical work is determined in accordance with WHS/OHS requirements and conducted in accordance with workplace procedures
- Circuits are isolated in accordance with WHS/OHS requirements and workplace procedures
- WECS problems are solved using measured and calculated values of apparatus operating parameters and in accordance with workplace procedures
- Problems are solved without damage to apparatus, circuits, the surrounding environment and services using sustainable energy practices
- Complete work and document problem-solving activities
- Worksite is cleaned and made safe in accordance with workplace procedures
- Justification for solutions used to solve WECS problems is documented
- Work completion is documented and relevant person/s notified in accordance with workplace procedures