Elements and Performance Criteria
- Prepare for disconnection or reconnection
- WHS/OHS requirements and workplace procedures are followed in accordance with relevant industry standards
- Work clearances are obtained, and isolation and disconnection are followed in accordance with workplace procedures
- Disconnect designated HV electric propulsion components
- On-board cables are identified and marked, and connection sequence recorded
- Designated HV electric propulsion components are inspected for damage and conclusions verified with relevant person/s
- Visual inspections and checks of the designated HV electric propulsion components and associated wiring are carried out in accordance with workplace procedures to detect any abnormal or obvious damage or fault
- Isolated equipment is confirmed as de-energised
- Approval is obtained in accordance with workplace procedures from relevant person/s before any contingencies are implemented
- On-board cables are disconnected, where appropriate, without damage to terminals or components
- Designated HV electric propulsion component/s are dismantled, removed and/or replaced in accordance with relevant industry standards
- Designated HV electric propulsion components parts and/or associated components are stored appropriately to protect against damage
- Repairs to the removed equipment are in accordance with relevant industry standards and workplace procedures
- Reconnect designated HV electric propulsion components
- Connections are checked and tested to confirm correct polarity and continuity
- Designated HV electric propulsion components are assembled and checked in accordance with relevant industry standards
- Designated HV electric propulsion components are inspected and tested for safety and correct operation
- Prepare for return to service
- Documentation is completed in accordance with workplace procedures
- Relevant person/s is notified when designated HV electric propulsion components are ready for return to service in accordance with workplace procedures