Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge
Elements and Performance Criteria
- Prepare to decommission electrical and electromechanical rail signalling from service
- Hazards are identified, WHS/OHS risks assessed, and control measures and workplace procedures implemented in preparation for work
- Scope of decommissioning is determined from job specifications, design drawings and regulatory requirements
- Appropriate safe working person/s is consulted to ensure work is coordinated effectively with others involved on the worksite
- Materials needed for the safe disconnection of circuits, equipment and components are obtained in accordance with workplace procedures and checked against job specifications
- Tools, equipment and testing devices needed to disconnect circuits, equipment and components are obtained in accordance with workplace procedures and checked for correct operation and safety
- Withdraw electrical and electromechanical rail signalling from service
- On-track safe working requirements are complied with in accordance with relevant industry standards and network rules
- Inspection is carried out and circuits, equipment and components are checked to ensure they are in accordance with manufacturer and system specifications
- Disconnecting, isolating and removal of redundant wiring; the termination of altered wiring; and checking indicators and signal system operation are completed in accordance with network requirements and relevant industry standards
- Methods for dealing with unplanned situations are selected on the basis of safety and specified work outcomes
- Decommissioning is performed efficiently, without waste of materials or damage to apparatus, the surrounding environment or services using sustainable energy practices
- System and design faults are verified using relevant, technical information, fault-finding and diagnostic techniques to identify faulty rail signalling equipment
- Faulty rail signalling equipment is replaced, adjusted and secured in accordance with manufacturer specifications and workplace procedures
- Control equipment is adjusted, inspected and tested using workplace test procedures and equipment to ensure it operates in accordance with specified industry technical standards
- Complete decommissioning work and reports
- System faults are identified and reported for follow-up action in accordance with workplace procedures
- Inspection and test results are documented in accordance with workplace procedures and faulty or replaced equipment is tagged and despatched to maintain equipment spares