Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Prepare to decommission electrical and electromechanical rail signalling from service
  2. Hazards are identified, WHS/OHS risks assessed, and control measures and workplace procedures implemented in preparation for work
  3. Scope of decommissioning is determined from job specifications, design drawings and regulatory requirements
  4. Appropriate safe working person/s is consulted to ensure work is coordinated effectively with others involved on the worksite
  5. Materials needed for the safe disconnection of circuits, equipment and components are obtained in accordance with workplace procedures and checked against job specifications
  6. Tools, equipment and testing devices needed to disconnect circuits, equipment and components are obtained in accordance with workplace procedures and checked for correct operation and safety
  7. Withdraw electrical and electromechanical rail signalling from service
  8. On-track safe working requirements are complied with in accordance with relevant industry standards and network rules
  9. Inspection is carried out and circuits, equipment and components are checked to ensure they are in accordance with manufacturer and system specifications
  10. Disconnecting, isolating and removal of redundant wiring; the termination of altered wiring; and checking indicators and signal system operation are completed in accordance with network requirements and relevant industry standards
  11. Methods for dealing with unplanned situations are selected on the basis of safety and specified work outcomes
  12. Decommissioning is performed efficiently, without waste of materials or damage to apparatus, the surrounding environment or services using sustainable energy practices
  13. System and design faults are verified using relevant, technical information, fault-finding and diagnostic techniques to identify faulty rail signalling equipment
  14. Faulty rail signalling equipment is replaced, adjusted and secured in accordance with manufacturer specifications and workplace procedures
  15. Control equipment is adjusted, inspected and tested using workplace test procedures and equipment to ensure it operates in accordance with specified industry technical standards
  16. Complete decommissioning work and reports
  17. System faults are identified and reported for follow-up action in accordance with workplace procedures
  18. Inspection and test results are documented in accordance with workplace procedures and faulty or replaced equipment is tagged and despatched to maintain equipment spares

Performance Evidence

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements and performance criteria on at least one occasion and include:

reading and interpreting specifications correctly

disconnecting signalling circuits, equipment and components to meet operational and technical standards

using effective fault diagnosis and repair/replacement techniques to specified model level

confirming circuits, equipment and components operated within specified technical parameters

testing equipment and instruments

using tools correctly

following relevant codes of practice, environmental protection procedures and requirements

completing relevant technical reports, records and documentation

dealing with unplanned events

applying rail safe working practices and relevant industry standards, codes and rail safety regulations

applying relevant work health and safety (WHS)/occupational health and safety (OHS) requirements, including:

implementing workplace procedures and practices

using risk control measures

applying sustainable energy principles and practices

decommissioning electrical and electromechanical rail signalling from service in accordance with workplace procedures

preparing to decommission electrical and electromechanical rail signalling from service

withdrawing electrical and electromechanical rail signalling from service.


Knowledge Evidence

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements and performance criteria and include knowledge of:

electrical and electromechanical rail signalling decommissioning, safe working practices and relevant standards, codes and regulations, including:

purpose of decommissioning

decommissioning planning and documentation

decommissioning requirements and hazards

decommissioning procedures

fault diagnosis and repair/replacement techniques

relevant job safety assessments or risk mitigation processes

relevant manufacturer specifications

relevant safe working practices, industry standards, codes of practice, regulations and WHS/OHS legislated requirements, including decommissioning requirements and hazards

relevant workplace documentation.