Google Links
Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge
Elements and Performance Criteria
- Prepare to install/maintain CBI rail equipment
- Hazards are identified, WHS/OHS risks assessed, and control measures and workplace procedures are implemented in preparation for work
- Scope of installation/maintenance work is determined from job specifications, drawings and regulatory requirements
- Materials needed for the installation/maintenance work are obtained in accordance with workplace procedures and checked against job specifications
- Tools, equipment and testing devices needed for installation/maintenance work are obtained in accordance with workplace procedures and checked for correct operation and safety
- Install/maintain CBI rail system
- Reports or fault logs are identified by accessing diagnostic terminal
- Fault correction activities are prioritised by reviewing the fault reports and previous corrective actions
- Records of previously corrective actioned faults are deleted/cleared from the terminal
- Source of the fault is identified by assessing the diagnostics terminal
- Corrective action required is determined and implemented
- Appropriate mechanisms for the safe and efficient rectification of the fault are determined
- Methods for dealing with unplanned situations are determined on the basis of safety and specified work outcomes
- Rail system monitoring is conducted efficiently, without waste of materials or damage to apparatus, the surrounding environment or services using sustainable energy practices
- Replacement equipment is obtained from spare stock to comply with identified fault repair requirements
- Faulty component/equipment is identified and removed in accordance with organisation practices and procedures
- Replacement component/equipment is installed and connected to power in accordance with manufacturer specifications
- Correct test procedures are identified and implemented to confirm all operations are within specifications
- Equipment operations are monitored to ensure system integrity
- Signal and voltage levels are monitored, checked and adjusted, as required, in accordance with operational requirements
- Completed statistical records and equipment/operational management information are accurately recorded and maintained to support ongoing monitoring of systems and equipment performance
- Complete CBI rail system installation/maintenance
- Non-conforming equipment is identified and tagged for repair type and extent of fault is identified and recorded, as required
- Faulty equipment requiring repair is segregated and appropriate records are completed in preparation for despatching to repairer
- Spare equipment stocks are reviewed to ensure adequate availability
- Priority for repair and/or replacement of equipment is determined by evaluation of stock levels and fault logs
- Work completion is documented and appropriate person/s notified of repair and replacement priorities in accordance with workplace procedures and relevant reports produced
Range Statement
Performance Evidence
Knowledge Evidence
Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements and performance criteria and include knowledge of: |
CBI systems installation/maintenanceelectronic communications, principles encompassing:requirements of a basic communications system - satellites, data communications, navigation, telecommunications and noise antennae and electro-magnetic wave propagationreason for modulationamplitude and frequency modulation, difference, advantages and disadvantagessimple transmitter and receiver circuits (block diagram level)optical communications principlesrail signalling - electronic equipment encompassing:equipment and their components - telemetry (supervisory control and data acquisition (SCADA)), monitoring systems, IASS, train describer and panel processorsoperating principles and parametersservicing procedurescomputer peripherals encompassing:types and applicationsoperating principlessoftware (drivers) installationnetwork management of peripheral devicespersonal computers (PCs), engineering applications and software basics encompassing:application software typesconfigurations and preferencesuse of particular software packages - word processor, spreadsheet, database, presentation software, web/document publisher, computer-aided design (CAD)/drawing packages, email, and client and business managementrail signalling - CBI encompassing:equipment and their components - SSI, Microlock and Westraceoperating principles and parametersservicing proceduresrail signalling - computer applications encompassing:types of software and their scope - interrogator software for loggers, monitors and CBI and database (work instruction, commissioning work structures and cable schedules)setting up and userail signalling - remote control systems encompassing:equipment and their components - programmable logic controllers (PLCs), dedicated PCs and prep systemsoperating principles and parametersservicing procedureselectronic equipmentrelevant job safety assessments or risk mitigation processesrelevant manufacturer specificationsrelevant WHS/OHS legislated requirementsrelevant workplace documentationrelevant workplace policies and proceduressafe working practices and relevant industry standards, codes and regulations. |