Google Links
Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge
Elements and Performance Criteria
- Prepare to install/ non-vital screen-based control systems
- Hazards are identified, WHS/OHS risk are assessed, and control measures and workplace procedures are followed in preparation for the work
- Scope of maintenance is determined from maintenance schedules, job specifications, drawings and regulatory requirements
- Appropriate rail safe working person/s is consulted to ensure work is coordinated effectively with others involved on the worksite
- Materials needed for installation/maintenance work are obtained in accordance with workplace procedures and checked against job specifications
- Tools, equipment and testing devices needed to install/maintain work are obtained in accordance with workplace procedures and checked for correct operation and safety
- Install/maintain non-vital screen-based control systems
- Non-vital screen-based control systems are installed/maintained to comply with technical industry standards, job specifications and requirements
- Control system fault-finding and repairs are performed efficiently, without waste of materials, damage to apparatus, the surrounding environment or services using sustainable energy practices
- Control system faults are verified using relevant technical industry standard information, fault-finding and diagnostic techniques to identify faulty control equipment
- Faulty modules are replaced, adjusted and secured in accordance with manufacturer specifications and workplace procedures
- Methods for dealing with unplanned situations/events are selected on the basis of safety and specified work outcomes
- Complete non-vital screen-based control system installation/maintenance
- Control equipment is inspected, adjusted and tested using workplace test procedures and equipment to ensure system operates within specified technical industry standards
- Control system faults identified beyond the scope of first level maintenance are reported for follow-up action in accordance with workplace procedures
- Inspection and test results are documented in accordance with workplace procedures and, as required, faulty and/or replaced module/s are tagged with relevant reports
Range Statement
Performance Evidence
Knowledge Evidence