Google Links
Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge
Elements and Performance Criteria
- Prepare to install/maintain vital relay interlocking system
- Hazards are identified, WHS/OHS risks assessed, and control measures and workplace procedures are implemented in preparation for work
- Scope of installation/maintenance work is determined from job specifications, drawings and regulatory requirements
- Appropriate rail safe working person/s is consulted to ensure work is coordinated effectively with others to minimise traffic disruptions
- Materials needed for installation/maintenance work are obtained in accordance with workplace procedures and checked against job specifications
- Tools, equipment and testing devices needed for installation/maintenance work are obtained in accordance with workplace procedures and checked for correct operation and safety
- Install/maintain vital relay interlocking system
- Visual inspection of installation wiring and equipment is carried out to identify damaged or faulty equipment
- Damaged or faulty component/s identified during inspection is replaced in accordance with technical instructions, manufacturer specifications and workplace maintenance procedures
- Installation/maintenance is performed efficiently, without waste of materials or damage to apparatus, the surrounding environment or services using sustainable energy practices
- Systems are investigated using appropriate fault-finding and diagnostic techniques to identify faults
- Fault circuit indicators and maintenance records are used to assist in the identification of electrical faults
- Repairs, replacement and/or adjustment of equipment/systems are carried out using appropriate tools and test equipment to ensure equipment/systems function to relevant technical and operational standards
- Faulty, worn, damaged or insecure components are repaired/replaced or secured whilst ensuring system safety integrity is maintained in accordance with technical and/or manufacturer specifications
- Methods for dealing with unplanned situations are determined on the basis of safety and specified work outcomes
- Vital relay interlocking system is inspected and tested in accordance with workplace test procedures and relevant equipment is used to ensure it operates within specified technical parameters
- Complete vital relay interlocking system installation/maintenance
- Reusable, faulty and worn components are tagged and despatched for repair in accordance with workplace procedures
- Maintenance work activities are recorded in accordance with workplace procedures and organisation requirements
- Documentation, including component faults test results, authorisations and permits, is completed to provide an accurate database and facilitate follow-up action and relevant reports produced
Range Statement
Performance Evidence
Knowledge Evidence