Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Prepare to repair rail signalling cables
  2. Hazards are identified, risks assessed, and control measures and workplace procedures implemented
  3. Safety hazards that have not previously been identified are noted on the job safety assessments and existing risk control measures implemented
  4. Access times and safe work methods are confirmed to comply with customer requirements and relevant rail safety legislation
  5. Appropriate person/s is consulted to ensure work is coordinated effectively with others on the worksite
  6. Extent and nature of the fault or damage to the rail signalling cable is confirmed with appropriate person/s in accordance with workplace procedures
  7. Cable joining kit is obtained in accordance with workplace procedures and components checked with manufacturer specifications
  8. Cable diagrams necessary to effect repairs are obtained, read and interpreted
  9. Tools and cable testing devices for cable repair are obtained in accordance with workplace procedures and checked for correct operation and safety
  10. Repair damaged rail signalling cables
  11. Corresponding ends of broken cable core are identified by core marking and confirmed by continuity test in accordance with workplace procedures
  12. Cable joining kit is used to repair damaged cable following manufacturer specifications and workplace procedures
  13. Repair to damaged cable is tested for cable core continuity insulation between cable cores and cores to earth in accordance with workplace procedures
  14. Cause of failed cable test is located and rectified in accordance with workplace procedures
  15. Existing work methods for dealing with unplanned situations are dealt with safely in a manner that minimises risk to personnel and equipment and with the approval of an authorised person/s
  16. Cable repair is completed without waste of materials or damage to apparatus, the surrounding environment or services using sustainable energy practices
  17. Complete rail signalling cable repairs
  18. Work area is cleaned and made safe in accordance with workplace procedures
  19. Cable repair work, test results and relevant reports are documented and appropriate person/s notified in accordance with workplace procedures

Range Statement

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the UEE Electrotechnology Training Package Companion Volume Implementation Guide.

Performing signalling cable repairs must include the following:

repairing at least one signalling power cable relevant to a particular rail transport operator

repairing at least one signalling multi-core control cable, six cores or greater, relevant to a particular rail transport operator

repairing signalling cables using at least one approved jointing kit


Performance Evidence

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements, performance criteria and range of conditions on at least two separate occasions and include:

applying relevant work health and safety (WHS)/occupational health and safety (OHS) requirements, including using risk control measures

applying sustainable energy principles and practices

completing rail signalling cable repairs

completing relevant technical reports, records and documentation

dealing with unplanned events in a manner that minimises risk to personnel and equipment

identifying corresponding ends of broken cable cores accurately

interpreting cable diagrams

locating and rectifying causes of failed cable test

preparing to repair rail signalling cables

repairing damaged rail signalling cables effectively and in accordance with workplace procedures

selecting approved cable joining kit, cable repair tools and testing devices

using testing devices and tools correctly and safely.


Knowledge Evidence

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements, performance criteria and range of conditions and include knowledge of:

conductor continuity and core insulation and earth testing procedures and acceptable results, including:

testing to confirm de-energised cores

continuity of repaired cores, earth resistance of repaired cores and insulation between repaired cores

industry standard acceptable cable test results

recording of test results

methods of joining broken cable core conductors and reinstating insulation, including:

using hand tools to remove insulation and apply crimp lugs

selecting inline joiner lugs

selecting appropriate jointing materials and kits

relevant job safety assessments or risk mitigation processes

relevant manufacturer specifications

relevant WHS/OHS legislated requirements

relevant workplace documentation

relevant workplace policies and procedures

special termination tools and their use, including:

insulation removal tools

inline crimping tools

conducting tool tests

checking calibration date

recording tests

types of cable used for rail signalling including signalling power and multi-core control cables

types of cable joining kits used to repair damaged signal cables, including heat shrink and waterproof jointing (epoxy mould)

workplace procedures for identifying corresponding ends of broken cable cores, including cable isolation methods and testing de-energised cable cores.