Google Links
Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge
Elements and Performance Criteria
- Prepare to locate, prove and protect utility assets
- Work health and safety (WHS)/occupational health and safety (OHS), environmental and sustainable energy policies and procedures, relevant clearances and no-go zones are obtained and applied in accordance with workplace procedures
- Hazards are identified, risks are assessed and control measures are prioritised, implemented and monitored
- Level of responsibility under the relevant work permit and/or notification is obtained and confirmed with relevant person/s in accordance with job requirements and workplace procedures
- Relevant person/s, authorities and/or enterprises are consulted to ensure the work is coordinated effectively with others involved
- Tools, equipment and personal protective equipment (PPE) required to carry out the work are identified, obtained and checked for correct operation and safety in accordance with workplace procedures
- Materials, plans, diagrams, drawings and resources required for the work are obtained in accordance with workplace procedures
- Site preparation, safety plan and work schedule are confirmed in accordance with workplace procedures
- Locate, prove and protect utility assets
- Materials, tools and equipment required for the work are selected and used correctly and safely in accordance with manufacturer instructions and workplace procedures
- Utility asset is located and clearly marked using selected equipment and tools in accordance with workplace procedures
- Location of the asset proven using approved methods where permitted in accordance with workplace procedures
- Utility asset is protected physically to ensure it is safe and secure in accordance with workplace procedures
- Work is carried out to the required quality standard without waste of materials or damage to apparatus, equipment, the surrounding environment or services and using sustainable energy principles
- Unplanned events are referred to immediate supervisor for directions in accordance with workplace procedures
- Complete work and relevant documentation
- Work site is tidied and made safe, or handed over to relevant person/s for further work in accordance with workplace procedures
- Tools, equipment and any surplus resources/materials are cleaned, checked and securely stored in accordance with workplace procedures
- Relevant person/s are notified of work completion in accordance with workplace procedures
- Work completion documentation is completed accurately and provided to relevant person/s in accordance with workplace procedures
Range Statement