Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Plan control of pipeline operations
  2. Work is prioritised and sequenced for completion within acceptable timeframes following consultation with relevant person/s in accordance with workplace procedures
  3. Hazards are identified, work health and safety (WHS)/occupational health and safety (OHS) risks are assessed and control measures prioritised, implemented and monitored in accordance with workplace procedures
  4. Job requirements, work permit/s, resources and workplace procedures for the work are obtained for work site/s and communicated to relevant person/s in accordance with workplace procedures
  5. WHS/OHS, environmental and sustainable energy policies and procedures are obtained and applied to ensure safe systems of work are followed
  6. Relevant work permit/s are obtained to coordinate and perform work in accordance with regulatory and job requirements and workplace procedures
  7. Relevant resources required for the work are identified and obtained in accordance with workplace procedures
  8. Clients are provided with possible solutions and options within the scope, acceptable cost and job requirements parameters
  9. Communication issues with relevant stakeholders are resolved and work coordinated in accordance with work schedule and workplace procedures
  10. Person/s participating in the work are briefed and responsibilities coordinated and authorised in accordance with workplace procedures
  11. Site is prepared to minimise risk and damage to property, commerce and individuals in accordance with the work schedule and workplace procedures
  12. Control pipelineoperations
  13. Hazardous activities are conducted safely in accordance with regulatory requirements and workplace procedures
  14. Operating conditions, pressures and temperatures of the pipeline are monitored and observed to ensure correct operating parameters are maintained in accordance with workplace procedures
  15. Alarms, codes and hazard warnings are correctly recognised and the correct response strategy is selected and applied in accordance with workplace procedures
  16. Remedial action/s are taken to address any shortfalls encountered in the work schedule in accordance with workplace procedures
  17. Work is coordinated to ensure completion in agreed timeframe and to industry standards with a minimum of waste in accordance with job requirements and workplace procedures
  18. Unplanned events and non-routine problems are identified and actioned in accordance with workplace procedures
  19. Quality and safety checks of the work are conducted in accordance with job requirements, workplace procedures and community and industry standards
  20. Shut down pipeline system and complete relevant documentation
  21. Accidents and injuries are reported and followed up as required in accordance with workplace procedures
  22. Work site is rehabilitated/cleaned up and confirmed safe in accordance with workplace procedures
  23. Shutdown is completed in accordance with workplace procedures
  24. Pre-shutdown checks are completed, documented and shift handover is conducted in accordance with workplace procedures

Range Statement

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the UEG Gas Training Industry Package Companion Volume Implementation Guide.

resources must include at least seven (7) of the following:

process control equipment

station power supply

heaters and heat exchanges

station instrumentation

drawings and schematics

metering equipment and gas analysis equipment

valves, actuators and flanges

compressors and prime movers

sumps and drains

pipeline inspection gauges (PIGs)

monitoring systems must include at least four (4) of the following:

use of fire and gas extinguishing and deluge systems

emergency systems

alarm and communication systems

supervisory control and data acquisition (SCADA)

prime wovers and compression systems

shutdown systems

pipeline faults must include the following:

gas leaks

electrical problems

compressor or pump failure

out-of-current inspection status

gauge failure or hose rupture leaks

instruments out of calibration

non-flow of gas