Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Prepare to carry out transmission pipeline construction work activities
  2. Job requirements and workplace procedures for the site are obtained and discussed with relevant person/s to confirm the work schedule
  3. WHS/OHS, environmental and sustainable energy policies and procedures are obtained and applied in accordance with workplace procedures
  4. Hazards are identified, risks are assessed and control measures prioritised, implemented and monitored in accordance with workplace procedures
  5. Responsibility under the relevant work permit and/or relevant notification is obtained and confirmed with relevant person/s in accordance with job requirements and workplace procedures
  6. Equipment, plant, tools and personal protective equipment (PPE) required for the transmission pipeline construction work are identified, scheduled, obtained and checked for correct operation and safety in accordance with workplace procedures
  7. Relevant person/s are consulted to ensure the work is coordinated effectively with others involved
  8. Materials, plans, diagrams, drawings and resources required for the transmission work activity are confirmed, scheduled and obtained in accordance with workplace procedures
  9. Site preparation, safety plans and work schedules are confirmed with relevant person/s in accordance with workplace procedures
  10. Carry out transmission pipeline construction work activity
  11. Materials, tools, equipment and measuring devices required for the work are selected and used correctly and safely in accordance with manufacturer instructions and workplace procedures
  12. Hazardous activities are conducted safely in accordance with WHS/OHS workplace procedures and job instructions
  13. Transmission pipeline construction is carried out to the required standard. without waste of materials or damage to apparatus, circuits, the surrounding environment or services using sustainable energy principles
  14. WHS/OHS risks and incidents are reported to authorised person/s for directions in accordance with workplace procedures
  15. Unplanned events are referred to authorised person/s for directions in accordance with workplace procedures
  16. Quality and safety checks of work are carried out in accordance with work instructions and workplace procedures
  17. Complete transmission pipeline construction activities
  18. Work site is tidied and made safe in accordance with workplace procedures
  19. Tools, equipment and any surplus resources and materials are cleaned, checked and securely stored in accordance with workplace procedures
  20. Appropriate person/s are notified of work completion in accordance with workplace procedures
  21. Documentation is completed accurately and provided to relevant person/s in accordance with workplace procedures

Range Statement

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the UEG Gas Industry Training Package Companion Volume Implementation Guide.

tools and equipment must include at least six (6) of the following:

general concrete mixer

general vacuum cleaner

general trolley

non-pressurised pumps and hoses

wheelbarrows

traffic barriers

extra low voltage lighting equipment

hand held tools

holiday detection equipment

power tools

pressurised pumps and hoses

tru bend

hand wrapping machines